Work Center - Planning (cprpd2100m000)
Use this session to list the work centers, which you can maintain and display in the details session.
To load work centers from the execution level as resources in Enterprise Planning, click on the appropriate menu.
- If you delete a work center, all planning data linked to that work center (rough capacity requirements and so on) are also deleted.
- Only resources specified in this session are considered in the planning methods of Enterprise Planning.
- If you started this session by zooming, you can only find and select a record.
Field Information
- Work Center
-
The work center for which the planning is made.
- Workload Norm
-
The workload norm in hours.
- Workload Tolerance
-
- Available Labor Resources
-
The required number of operators (people) for the work center.
If you selected the Critical in Master Planning check box in the Work Centers (tirou0101m000) session, LN bases the capacity planning on the Available Labor Resources field.
Default value
The default value is the value of the Available Labor Resources field in the Work Centers (tirou0101m000) session.
- Available Number of Machines
-
The number of machines required for the work center.
If you selected the Critical in Master Planning check box in the Work Centers (tirou0101m000) session, LN bases the capacity planning on the Available Number of Machines field.
Default value
The default value is the value of the Number of Machines field in the Work Centers (tirou0101m000) session.
- Calendar Code
- Resource Planning Horizon
-
- Operations Storage Horizon
-
Set the operation storage horizon to the maximum possible value (9999 days), unless the number of stored operations causes performance problems. These problems can occur sometimes, if you plan orders by using Infor SCM Planner. If you do not use Infor SCM Planner, you can avoid these problems by setting a reasonable fixed lead-time horizon.
Note: The operation storage horizon cannot be longer than the shortest order horizon among the plan items that are produced at the specified work center.Performance aspects
The setting of this field could affect system performance and database growth. For more information, refer to Operation storage horizon.
- Constraint
-
If this check box is selected, the work center is considered Constraint in the Resource Master Planning (RMP).
Note: This field is only used in workload control. - Critical in CTP
-
critical in CTP
If this check box is selected, LN takes into account the specified work center if it performs a capacity CTP check for an item that uses capacity of the work center.
Performance aspects
The setting of this field could affect system performance and database growth. For more information, refer to Maintain resource master plan.
- Maintain Resource Master Plan
-
If this check box is selected, LN generates a resource master plan when you initialize the scenario.
Note: After selecting this check box, use the Initialize, Roll, and Update Scenario (cprpd4200m000) session to initialize the resource master plan.Performance aspects
The setting of this field could affect system performance and database growth. For more information, refer to Maintain resource master plan.