Print Critical Material Requirements (cprmp2430m000)

Use this session to print a report of the critical material requirements for a specific plan item or a range of plan items.

Field Information

Scenario

Specify the first of a range of scenarios for which LN must print a report with information about critical material requirements.

Scenario

Specify the last of a range of scenarios for which LN must print a report with information about critical material requirements.

From Plan Item

Specify the first of a range of plan items for which LN must print the critical material requirements.

To Plan Item

Specify the last of a range of plan items for which LN must print the critical material requirements.

Period

Specify the first of a range of plan periods for which LN must print a report about critical material requirements.

Period

Specify the last of a range of plan periods for which LN must print a report about critical material requirements.

From Req. Item

Specify the first of a range of critical plan items that LN must use as a selection criterion to print reports.

To Req. Item

Specify the last of a range of critical plan items that LN must use as a selection criterion to print reports.

Period Required

Specify the first of a range of plan periods in which the critical material requirements for which LN prints a report, must be required.

-

Specify the last of a range of plan periods in which the critical material requirements for which LN prints a report, must be required.

Sort By

Select which report is printed.

Allowed values

  • Plan Item
  • Component