Item Routings
In the Routing Operations (tirou1102m000) session, to enable third party
      owned – NPT process, specify this information:
  - verify that the Subcontracting with Material Flow check box is selected
 - subassembly data is updated in the Subassembly
 - and Subassembly Warehouse fields in the Subcontracting section for all the routing operations associated with the manufactured item (main item)