Item Routings

In the Routing Operations (tirou1102m000) session, to enable third party owned – NPT process, specify this information:
  • verify that the Subcontracting with Material Flow check box is selected
  • subassembly data is updated in the Subassembly
  • and Subassembly Warehouse fields in the Subcontracting section for all the routing operations associated with the manufactured item (main item)