Other Preferences tab (My SolidWorks Preferences)
Use this tab to set the preferences for:
- Controlling the PLM objects of a SolidWorks file that can be attached to the business process.
- Renaming SolidWorks files.
- Troubleshooting.
Preferences | Description |
---|---|
Attached to Business Process | The PLM objects of a SolidWorks file that can be attached to the business
process. Possible values:
|
Attach related Models/Drawings | If this check box is selected, the PLM objects (items, documents) of the Models
or Drawings associated with the SolidWorks file are attached to the business
process. Note: The
objects are attached based on the value set in the Attached to Business Process field.
|
Attach all related objects | If this check box is selected, the PLM objects (items, documents) of all the
components in CAD structure, of a SolidWorks file are attached to the business
process. Note: The objects are attached based on the value set in the Attached to Business Process field.
|
Action for objects locked by Business Process | The action that must be taken if one or more objects are locked by another
business process. Possible values:
|
Attach Draft Objects Only | If this check box is selected, only the draft objects (items/documents) are attached to the business process. |
Attach all Items | If this check box is selected, all items linked to the document are considered
for dispatch. Note: If this check box is cleared, only the default item is considered for
dispatch.
|
Preferences | Description |
---|---|
Part template | The full path of the Solidworks template file. |
Assembly template | The full path of the Solidworks template file. |
Note: The Solidworks files are created based on the item structure in PLM.
The last level items are created as Solidworks Parts and all other items are created as
Solidworks Assembly files. The final Solidworks files are generated as part of the Top
Download process, using these template files.
Preferences | Description |
---|---|
Rename file in PLM on File - Save As operation | If this check box is selected and a file exists in PLM, during the Save As operation, the file is renamed automatically in PLM. |
Allow operations on previous revisions | If this check box is selected, you can rename and/or correct the file references of the previous revisions for a file. By default, the integration allows you to rename and upload the latest revision of a files. |
Preferences | Description |
---|---|
Generate Log files | If this check box is selected, log files are generated. |
Verify Dependency Mismatch | If this check box is selected the dependency mismatch of the current file is verified when the file is saved in PLM. |