To quarantine - rejected in inbound or outbound inspection

If the Quarantine or Scrap and/or Quarantine options are selected in the Rejects Handling field of the Item - Warehousing (whwmd4500m000) session, items rejected during inbound or outbound inspection can be sent to quarantine or be either scrapped or sent to quarantine. After the inspection is processed, LN moves the rejected items to the quarantine warehouse or quarantine location without creating a receipt or inbound advice.

For each processed inspection line that contains rejected items, a disposition line is created, which is displayed in the Quarantine Inventory (whwmd2671m000) session. The Non-conformance reference, inspection text and/or picture, if present, are copied from the inspection line to the disposition line.

For items scrapped during inspection, LN creates separate disposition lines when the inspection is processed and subsequently creates an adjustment order that removes these items from inventory. For these disposition lines, the Scrapped during inspection check box is selected in the Quarantine Inventory Disposition (whwmd2172m000) session.

Inventory levels, pegs, and ownership

When the items are put in the quarantine warehouse or the quarantine location, LN increases the inventory on hand and the inventory blocked. The setting of the Available for Planning parameter determines whether the quarantined inventory is available for planning.

The rejected items sent to quarantine after the inbound or outbound inspection is processed retain the peg and ownership properties acquired during inspection, except if the following criteria apply:

  • The items originate from purchase orders or purchase schedules
  • The Payable to Supplier check box is selected