Reason for Load Plan deviation (whinh4230m000)
Use this session to specify the reason why:
- A shipment is added to a load.
 - A shipment line is added to a shipment.
 - A shipment line is split.
 
The reason specified in the current session will overwrite the reason as specified in the Planned Loads/Shipments (whinh4180m000) session.
Field Information
- Reason
 - 
            
The reason why:
- A shipment is added to a load.
 - A shipment line is added to a shipment.
 - A shipment line is split.