Activities Section

The unassigned and assigned activities of the selected origins are displayed in the grid view. The user can view the activities in the grid and also use the column filters to filter the activities.

For example, the user can filter the Activity Status column based on the status Free, Planned, and Released.

Planned activities are displayed on the Planned Activities tab.

You can assign planned or unassigned activities to the required employee using the Gantt chart and the drag-and-drop option.

The workbench considers the Assignments are Mandatory check box setting in the Service Order Parameters (tssoc0100m000) session and the Work Order Parameters (tswcs0100m000). If this check box is selected, the Release menu on the Gantt activity bar context menu is enabled only when assignment exists for the activity. If the check box is cleared, the menu is always enabled.