tsacm domains
- Field Service
 - 
               
The reference activity can be used only for Field Service usage.
 - Depot Repair
 - 
               
The reference activity can be used only for Depot Repair usage.
 - General
 - 
               
The reference activity is not restricted to any particular usage and can be used generally. This activity can be used for Field Service and/or depot repair.
 - Rental
 - 
               
The reference activity can be used only for Rental usage.
 
- Activity Duration
 - 
               
The manual entry is considered to determine duration of the master routing operation.
 - Operation Lead Times
 - 
               
Total of the operation lead times (Labour Runtime, Machine Runtime and Setup Time) is considered to determine duration of the master routing operation.
 
- Labor
 - 
               
The labor required to execute a reference activity. The required labor time can be only be specified when the reference activity is used for field service.
 - Tool
 - 
               
The tool required to execute the reference activity. This tool is returned after the Reference Activity is completed.
 - Subcontracting
 - 
               
The subcontracting requirement. In case the reference activity is specified for subcontracting, and it is used for field service then the subcontracting requirement must be specified.
 - Other
 - 
               
The resource that is needed and which cannot be scaled, is termed as Other Resource Types.
 - Material
 - 
               
Materials that are needed to execute the reference activity.