Create Item Breakdown from Standard Production BOM (tscfg1210m200)
Use this session to create an item breakdown from a standard production bill of material (P-BOM).
You can link the item breakdown to an Installation in the Installation session as a so-called anonymous item.
Note: 
- Only P-BOM items listed in the Items - Service (tsmdm2100m000) session, and/or the Item Service Defaults (tsmdm2105m000) session, will be copied to the newly created item breakdown.
 - The project segment of the item cannot be used in this session.
 - If you create an item breakdown for manufactured items with a BOM quantity greater than one (1), a decimal quantity of item-breakdown components can result.
 
Field Information
- Production BOM
 - 
            
The item from which you want to copy the product structure to an item breakdown.
Note: The project segment of the item cannot be used in this session. - Description
 - 
            
The description of the P-BOM item.
 - Check Effectivity
 - 
            
If this check box is selected, LN only copies the items of the P-BOM that are valid on the date you enter in the Expiry Date field.
Note: The P-BOM items that expire after the entered date are also copied.If this check box is cleared, LN copies all items of the P-BOM.
 - Effective On
 - 
            
LN only copies the items of the P-BOM that are valid on this date/time.
Note:- The P-BOM items that expire after the entered date are also copied.
 - Clear the Check Effectivity check box to copy all the P-BOM items.
 
 - Copy Alternative Material
 - 
            
Select the checkbox to copy the alternative items along with the item breakdown details from the production BOM.