Update Budget Dates in Budget (tpptc1250m000)

Use this session to update the budget date in the bottom-up budget (element or activity). Using this method the budget date can be modified collectively instead of opening each budget line individually. Modifying the budget date can result in a change in the currency rates and also the prices or rates.

Field Information

Budget Type

Select whether the bottom up budget is of the type element or activity.

Budget Labor Lines

If this check box is selected, budget lines with a labor cost-type are included in the session.

Budget Material Lines

If this check box is selected, budget lines with a material cost-type are included.

Budget Equipment Lines

If this check box is selected, budget lines with a equipment cost-type are included.

Budget Subcontracting Lines

If this check box is selected, budget lines with a subcontracting cost-type are included.

Budget Sundry Cost Lines

If this check box is selected, budget lines with a sundry costs cost-type are included.