Rescheduling Messages for Subcontracting (tppss6107s000)
Use this session to view the details of a rescheduling message for a subcontracting purchase order generated during the last PRP run.
Rescheduling messages are generated for PRP orders of the following types:
- Firm-planned
 - Approved
 - Transferred
 
Rescheduling messages are not generated for transferred purchase budget lines.
Field Information
- Project
 - 
            
The code that uniquely identifies the project.
 - Order Type
 - 
            
The order type to which the rescheduling message applies.
This field can have the following values:
- PRP Purchase Order for the Firm-planned or Approved status
 - Purchase Order for transferred PRP purchase orders
 - Request for Quotation for transferred PRP purchase orders
 
 - Order Number
 - 
            
The code of the order to which this message applies.
 - Position Number
 - 
            
The position number of the order line. As an order can have multiple order lines, this number is used to identify the particular line to which the rescheduling message applies.
 - Sequence Number
 - 
            
The sequence number which identifies the rescheduling message.
 - Subcontracting
 - 
            
The code that uniquely identifies the subcontracting item.
 - Reference Type
 - 
            
The reference type of the subcontracting. This indicates if the subcontracting is standard or project specific.
 - Cost Determination
 - 
                  
Indicates how cost amounts related to the cost object are calculated in the actual budget.
Allowed values
- Quantity
 - 
               
The costs related to the subcontracting cost object are calculated, by quantity-based measure of productivity.
 - Amount of Time
 - 
               
The costs related to the subcontracting cost object are calculated, by time-based measure of productivity. Example, the subcontractor can be paid by the hour.
 - Rate Only
 - 
               
The costs related to the subcontracting cost object are calculated, based on only an agreed rate.
 - Amount Only
 - 
               
The costs related to the subcontracting cost object are calculated, based on only an amount (lump sum).
 
Note: The field can be set to Rate Only or Amount Only only if:- The Services Procurement is set to In Preparation or Active in the Implemented Software Components (tccom0100s000) session.
 - The Procurement by field is set to Subcontracting Procurement Order.
 
 - Base Unit
 - 
                  
The unit type used for cost determination.
Allowed values
- Not Applicable
 - Quantity
 - Time
 
Note:- This field is displayed only if the Services Procurement is set to Active or In Preparation in Implemented Software Components (tccom0100s000)session.
 - This field is enabled only if the Cost Determination field is set to Amount Only or Rate Only.
 - This field is set to Not Applicable if the Cost Determination field is set to Amount of Time or Quantity.
 - This value cannot be modified when used for a planned PRP order or when costs are booked based on this value.
 
 - Transaction Date
 - 
            
The date and time when the rescheduling message was generated.
 - Quantity
 - 
            
The required quantity based on the project control budget.
 - Quantity
 - 
            
The ordered quantity.
 - Delivery Date
 - 
            
The required delivery date of the subcontracting item. This date is calculated from the project control budget data.
 - Delivery Date
 - 
            
The planned delivery date of the ordered subcontracting item.
 - Message
 - 
            
The type of rescheduling message.
Allowed values
- Reschedule In
 - 
               
The order must be delivered earlier. There is a discrepancy between the delivery date on the order and the required delivery date. This can be caused by:
- The start date of the element (or, if not available, the project) being moved up.
 - The start date of the activity budget line being moved up (either manually or as a result of changes in the external scheduling package).
 - The delivery date of the order being deliberately postponed.
 
 - Reschedule Out
 - 
               
The order must be delivered later. There is a discrepancy between the delivery date on the order and the required delivery date. This can be caused by:
- The start date of the element (or if not available, the project) being postponed.
 - The start date of the activity budget line being postponed (either manually or as a result of changes in the external scheduling package)
 - The delivery date of the order being deliberately moved up.
 
 - Cancel
 - 
               
There is a discrepancy between the quantity on the order and the required quantity. (Part of) the quantity is no longer required.
 - Rate Change
 - 
               
This is relevant for equipment and subcontracting with the Cost Determination method set to Rate Only. The rate used on a purchase order is different than the current budgeted rate. You must verify if modifications are required.
 - Review Changes
 - 
               
This is relevant for the equipment with the Cost Determination method set to Amount of Time. After an Equipment Procurement Order is generated for a budget line, and both the quantity and amount of time are changed, the budget line should not result in a new order. This is supported by a rescheduling message.