External Scheduling Resources (tppss2134m000)

Use this session to view the resource related project data that is linked to the external scheduling package.

Note: 

The data in this session is populated from the External Scheduling Interface (tppss2231m000) session, when you import/ export the Infor LN project data from/ to an external scheduling interface.

Field Information

Project

The code of the project for which the external scheduling package is used.

Description

The description or name of the code.

Plan

The plan that must be used for the import or export of the project data to or from an external scheduling package.

Description

The description or name of the code.

Connection Node

The activity or node of the Infor LN Project (related to resource) that must be connected to the activity or node of a project in the external scheduling package. If you link a complete project in Infor LN to a project in the external scheduling package, this node is not specified.

Description

The description or name of the code.

Resource Type

The type of the resource.

Allowed values

Employee
Trade Group
Labor
Material
Subcontracting
Equipment
Sundry
Not Applicable
Project Resource

Indicates if the resource is associated to the project.

Object

The Object linked to the project.

ESP Reference

The reference number linked to the external scheduling package (ESP).

Unit Determinator

The unit based on which the work is measured.

Allowed values

Quantity
Time
Not Applicable
Cost Rate

The cost rate linked to the project that is imported or exported to or from the external scheduling package.

Currency

The currency linked to the project that is imported or exported to or from the external scheduling package.

Description

The description or name of the code.

Rate Unit

The unit in which the quantity or time is expressed.

Cost Rate in ESP Currency

The cost rate of the resources that is expressed in the currency supported by the external scheduling package (ESP).

Description

The description or name of the code.

Calendar

The code of the calendar used by the external scheduling package.

Description

The description or name of the code.

Availability Type

The availability type used by the external scheduling package.

Description

The description or name of the code.

ESP Base Calendar Reference

The reference number of the base calendar that is linked to the external scheduling package.

ESP Resource Calendar Reference

The reference number of the resource calendar that is linked to the external scheduling package.

User Account

The user responsible for the import or export of the project data to or from the external scheduling package.

Description

The description or name of the code.

E-mail

The email address of the user who is responsible for the import or export of the project data to or from the external scheduling package.

Primary Key

The primary key linked to the project.

Synchronization Status

The status of the synchronization of the Infor LN project data with the external scheduling package.

Allowed values

Synchronized
Delete
Modify
New