Print Costs by Period (tpppc4416m000)

Use this session to print control reports for the actual costs by cost control periods.

The levels at which cost control is generated are selected in the Project - Cost Control Levels (tppdm6102m000) session.

Field Information

Level to be Printed

The level on which the data is printed.

Cost Control Period

The year in which the transaction must be posted to the project history for cost control. The default value of this field is the year of the date of input's cost-control period.

/

The period in which the transaction must be posted to the project history for cost control. The default value of this field is the date of input's cost-control periods.

Commitments

If this check box is selected, the commitments are taken as costs.