Structural Materials to be Settled by Project (tpppc3130s000)

Use this session to maintain the structural material linked to a project, an element, an activity, and an extension. You can enter material for which the price can fluctuate during a period.

In this session, the price changes of the material can be settled for this project on the basis of the index value.

Field Information

Project

The code that identifies the project.

Project Status

The project status.

Material

The structural material for which the indices are recorded are entered.

Index Table

The table containing the price changes for structural material.

Depending on the situation, some structural materials require the use of different index tables.

Reference Date

The reference date based on which LN computes the index value.

LN compares this date with the start dates recorded in the Price Fluctuation Settlement Indices (tppdm0158m000) session. Each start date (and indirectly all dates between two successive start dates) is assigned an index value. In the case of a settlement, the index value for the period of the reference date is relevant for the selected fluctuation settlement.

Element

The element code.

Activity

The activity's code.

Extension

The extension code.