Print Financial Transactions (tpppc2414m100)
Use this session to print the financial transactions resulting from Project.
Field Information
- General
 - 
            
- Project
 - 
                     
The From and To fields define a range of: projects for which the financial transactions are printed.
 - Element
 - 
                     
The From and To fields define a range of: elements.
 - Activity
 - 
                     
The From and To fields define a range of: activities.
 - Cost Component (Control)
 - 
                     
The From and To fields define a range of: cost components.
 - Extension
 - 
                     
The From and To fields define a range of: extensions.
 - Reported Complete (Finance)
 - 
                     
Indicates the transactions that are included in the report.
Allowed values
Following are the allowed values:
- 
                           
Yes
Infor LN prints the transactions that are closed in Financials . - 
                           
No
Infor LN prints the transactions that are not closed in Financials . - 
                           
Both
Infor LN prints all the transactions. 
 - 
                           
 - 
                     
- 
                              
The financial transaction types that are included in the report.
Allowed values
- Ledger Transactions
 - 
               
Infor LN prints only the financial transactions that are posted to the project cost ledger.
 - Borrow/Loan Balance
 - 
               
Infor LN prints only the borrow/loan transactions.
 - All Transactions
 - 
               
Infor LN prints all the financial transactions.
 
 
 - Print Transactions in
 - 
                     
- Project Currency
 - 
                              
If this check box is selected, Infor LN uses the project currency to print the financial transactions.
Default value
By default, this check box is selected.
 - Currency
 - 
                              
The currency used to print the financial transactions.
Note: This field is disabled if you select the Project Currency check box. 
 - Attachments
 - 
                     
- Print Text
 - 
                              
If this check box is selected, Infor LN prints text related to the selected range of data.
 
 - Sort By
 - 
                     
The sort sequence for the report.
Allowed values
- Project/Element/Cost Cmp
 - Project/Activity/Cost Cmp
 - C.Type/C.Obj/Proj/Element
 - C.Type/C.Obj/Proj/Activity
 - Proj./Cost Type/Cost Object
 - Proj./Cost Type/Cost Obj(Margin)
 - Cost Control Period
 - Financial Period
 - Project/Element/Cost Type
 - Transaction Date
 - Posting Type
 - Processing Run
 - Invoice
 - Buy-from Business Partner
 - Hours Control Period (Cost Details)
 - Hours Control Period (Sales Details)
 - Employee/Hours Control Period
 - Sold-to BP/Project/Revenue
 - Proj./Extension/Cost Type
 - Proj./Extension/Cost Cmp
 - Proj./Activity/Phantom Item
 - Project/Activity/Cost Type
 
 
 - Cost Types
 - 
            
- Options
 - 
                     
- Material
 - 
                              
If this check box is selected, Infor LN prints the financial transactions for the selected range of material items.
 - From and To
 - 
                              
The From and To fields define a range of: project items.
Note: This field is enabled only if the Material check box is selected. - Posting Type
 - 
                              
The From and To fields define a range of: posting types for the material transactions.
Allowed values
- Additional Calculation Office Variance
 - Shipment Variance Intercompany (Project)
 - General Costs Intercompany
 - Material
 - Material Intercompany
 - Value Correction
 - Repair Warranty Costs
 - WIP Hours
 - Warranty Costs
 - WIP Costs (through Financials)
 - WIP Transfer Issue
 - WIP Transfer Receipt
 - WIP Transfer Receipt Intercompany
 - Warehouse Surcharge Issue
 - Warehouse Surcharge Receipt
 - Cost of Sales
 - Goodwill
 - Tool Costs
 - Tool Costs Intercompany
 - Issue Intercompany (Project)
 - Adjustment
 - Landed Costs
 - Landed Costs Variance
 - Landed Costs Invoiced
 - Landed Costs Variance Invoiced
 - Invoiced WIP
 - Issue (Project)
 - Loan Result
 - Sales Order Price Variance
 - COS Intercompany
 - Planned Stage Payment
 - Released Stage Payment
 - Receipt (Stage Payment)
 - Loan
 - Borrow
 - Payback Result
 - Receipt Variance (Stage Payment)
 - Cost Peg Reallocation (Stage Payment)
 - Currency Variance (Stage Payment)
 - Approval (Claim)
 - Expense Tax (Stage Payment)
 - Loan Reversal
 - Borrow Reversal
 - Currency Variance
 - WIP Quarantine Issue
 - Quarantine Adjustment
 - Currency Variance (Landed Costs)
 - Revenues Intercompany
 - COS Price Variance
 - WIP Costs Intercompany
 - WIP Hours Intercompany
 - Expenses Intercompany
 - Landed Costs Intercompany
 - Landed Costs Invoiced Intercompany
 - Receipt Intercompany (Stage Payment)
 - Direct Receipt Intercompany
 - Variance Intercompany
 - COS Variance
 - Work Order Price Variance
 - Cost of Sales Recognition
 - COS Invoiced (Project)
 - Soft Commitment (Project Control)
 - Soft Commitment (Project Control) - Rev
 - Receipt (Project Warehouse)
 - Matched Receipt
 - Project Control
 - Inventory
 - Cost Invoice
 - Price Variance - Rev
 - Expense Tax
 - Landed Costs Expense Tax
 - Purchase Invoice
 - Landed Costs without Invoice
 - Field Service Cost
 - Labor Cost
 - Hours (Subcontracting)
 - Manual Sales
 - Surcharge on Soft Commitment
 - Surcharge on Hard Commitment (Project)
 - Surcharge on Cost
 - Applied Overhead
 - Direct Delivery Issue
 - Stage Payment Invoice
 - Cost Peg Reallocation (Expense Tax)
 - Currency Gain and Loss
 - Direct Delivery Issue Intercompany
 - Direct Delivery Variance
 - Direct Delivery
 - Issue Result
 - Expenses
 - Variance Adjustment
 - Freight Price Variance
 - Field Change Order Costs
 - Freight Costs
 - General Costs Variance
 - General Costs (through Financials)
 - General Costs
 - General Costs Work Order
 - Interim Result
 - Issue
 - Issue Intercompany
 - Item Surcharge Receipt
 - Item Surcharge Issue
 - On Order
 - Operation Costs
 - Price Variance
 - Transfer from Service WIP
 - Contract
 - Quarantine Receipt
 - Purchase Price Variance
 - Receipt
 - Rejection
 - Revaluation
 - Revenues
 - Revenues Analysis
 - Reverse Interim Result
 - Receipt Intercompany
 - Shipment Variance
 - Subcontracting
 - Subcontracting WIP
 - Rejection Intercompany
 - Subcontracting Intercompany
 - Operation Costs Intercompany
 - General Costs Work Order Intercompany
 - AFP Commitment
 
 - Labor
 - 
                              
If this check box is selected, Infor LN prints the financial transactions for the selected range of standard or project labor codes.
 - Labor
 - 
                              
The From and To fields define a range of: the standard or project labor.
 - Posting Type
 - 
                              
The From and To fields define a range of: posting types for the labor transactions.
Allowed values
- Additional Calculation Office Variance
 - Shipment Variance Intercompany (Project)
 - General Costs Intercompany
 - Material
 - Material Intercompany
 - Value Correction
 - Repair Warranty Costs
 - WIP Hours
 - Warranty Costs
 - WIP Costs (through Financials)
 - WIP Transfer Issue
 - WIP Transfer Receipt
 - WIP Transfer Receipt Intercompany
 - Warehouse Surcharge Issue
 - Warehouse Surcharge Receipt
 - Cost of Sales
 - Goodwill
 - Tool Costs
 - Tool Costs Intercompany
 - Issue Intercompany (Project)
 - Adjustment
 - Landed Costs
 - Landed Costs Variance
 - Landed Costs Invoiced
 - Landed Costs Variance Invoiced
 - Invoiced WIP
 - Issue (Project)
 - Loan Result
 - Sales Order Price Variance
 - COS Intercompany
 - Planned Stage Payment
 - Released Stage Payment
 - Receipt (Stage Payment)
 - Loan
 - Borrow
 - Payback Result
 - Receipt Variance (Stage Payment)
 - Cost Peg Reallocation (Stage Payment)
 - Currency Variance (Stage Payment)
 - Approval (Claim)
 - Expense Tax (Stage Payment)
 - Loan Reversal
 - Borrow Reversal
 - Currency Variance
 - WIP Quarantine Issue
 - Quarantine Adjustment
 - Currency Variance (Landed Costs)
 - Revenues Intercompany
 - COS Price Variance
 - WIP Costs Intercompany
 - WIP Hours Intercompany
 - Expenses Intercompany
 - Landed Costs Intercompany
 - Landed Costs Invoiced Intercompany
 - Receipt Intercompany (Stage Payment)
 - Direct Receipt Intercompany
 - Variance Intercompany
 - COS Variance
 - Work Order Price Variance
 - Cost of Sales Recognition
 - COS Invoiced (Project)
 - Soft Commitment (Project Control)
 - Soft Commitment (Project Control) - Rev
 - Receipt (Project Warehouse)
 - Matched Receipt
 - Project Control
 - Inventory
 - Cost Invoice
 - Price Variance - Rev
 - Expense Tax
 - Landed Costs Expense Tax
 - Purchase Invoice
 - Landed Costs without Invoice
 - Field Service Cost
 - Labor Cost
 - Hours (Subcontracting)
 - Manual Sales
 - Surcharge on Soft Commitment
 - Surcharge on Hard Commitment (Project)
 - Surcharge on Cost
 - Applied Overhead
 - Direct Delivery Issue
 - Stage Payment Invoice
 - Cost Peg Reallocation (Expense Tax)
 - Currency Gain and Loss
 - Direct Delivery Issue Intercompany
 - Direct Delivery Variance
 - Direct Delivery
 - Issue Result
 - Expenses
 - Variance Adjustment
 - Freight Price Variance
 - Field Change Order Costs
 - Freight Costs
 - General Costs Variance
 - General Costs (through Financials)
 - General Costs
 - General Costs Work Order
 - Interim Result
 - Issue
 - Issue Intercompany
 - Item Surcharge Receipt
 - Item Surcharge Issue
 - On Order
 - Operation Costs
 - Price Variance
 - Transfer from Service WIP
 - Contract
 - Quarantine Receipt
 - Purchase Price Variance
 - Receipt
 - Rejection
 - Revaluation
 - Revenues
 - Revenues Analysis
 - Reverse Interim Result
 - Receipt Intercompany
 - Shipment Variance
 - Subcontracting
 - Subcontracting WIP
 - Rejection Intercompany
 - Subcontracting Intercompany
 - Operation Costs Intercompany
 - General Costs Work Order Intercompany
 - AFP Commitment
 
 - Equipment
 - 
                              
If this check box is selected, Infor LN prints the financial transactions for the selected range of standard or project equipment codes.
 - from
 - 
                              
The From and To fields define a range of: the standard or project equipment.
 - Posting Type
 - 
                              
The From and To fields define a range of: posting types for the equipment transactions.
Allowed values
- Additional Calculation Office Variance
 - Shipment Variance Intercompany (Project)
 - General Costs Intercompany
 - Material
 - Material Intercompany
 - Value Correction
 - Repair Warranty Costs
 - WIP Hours
 - Warranty Costs
 - WIP Costs (through Financials)
 - WIP Transfer Issue
 - WIP Transfer Receipt
 - WIP Transfer Receipt Intercompany
 - Warehouse Surcharge Issue
 - Warehouse Surcharge Receipt
 - Cost of Sales
 - Goodwill
 - Tool Costs
 - Tool Costs Intercompany
 - Issue Intercompany (Project)
 - Adjustment
 - Landed Costs
 - Landed Costs Variance
 - Landed Costs Invoiced
 - Landed Costs Variance Invoiced
 - Invoiced WIP
 - Issue (Project)
 - Loan Result
 - Sales Order Price Variance
 - COS Intercompany
 - Planned Stage Payment
 - Released Stage Payment
 - Receipt (Stage Payment)
 - Loan
 - Borrow
 - Payback Result
 - Receipt Variance (Stage Payment)
 - Cost Peg Reallocation (Stage Payment)
 - Currency Variance (Stage Payment)
 - Approval (Claim)
 - Expense Tax (Stage Payment)
 - Loan Reversal
 - Borrow Reversal
 - Currency Variance
 - WIP Quarantine Issue
 - Quarantine Adjustment
 - Currency Variance (Landed Costs)
 - Revenues Intercompany
 - COS Price Variance
 - WIP Costs Intercompany
 - WIP Hours Intercompany
 - Expenses Intercompany
 - Landed Costs Intercompany
 - Landed Costs Invoiced Intercompany
 - Receipt Intercompany (Stage Payment)
 - Direct Receipt Intercompany
 - Variance Intercompany
 - COS Variance
 - Work Order Price Variance
 - Cost of Sales Recognition
 - COS Invoiced (Project)
 - Soft Commitment (Project Control)
 - Soft Commitment (Project Control) - Rev
 - Receipt (Project Warehouse)
 - Matched Receipt
 - Project Control
 - Inventory
 - Cost Invoice
 - Price Variance - Rev
 - Expense Tax
 - Landed Costs Expense Tax
 - Purchase Invoice
 - Landed Costs without Invoice
 - Field Service Cost
 - Labor Cost
 - Hours (Subcontracting)
 - Manual Sales
 - Surcharge on Soft Commitment
 - Surcharge on Hard Commitment (Project)
 - Surcharge on Cost
 - Applied Overhead
 - Direct Delivery Issue
 - Stage Payment Invoice
 - Cost Peg Reallocation (Expense Tax)
 - Currency Gain and Loss
 - Direct Delivery Issue Intercompany
 - Direct Delivery Variance
 - Direct Delivery
 - Issue Result
 - Expenses
 - Variance Adjustment
 - Freight Price Variance
 - Field Change Order Costs
 - Freight Costs
 - General Costs Variance
 - General Costs (through Financials)
 - General Costs
 - General Costs Work Order
 - Interim Result
 - Issue
 - Issue Intercompany
 - Item Surcharge Receipt
 - Item Surcharge Issue
 - On Order
 - Operation Costs
 - Price Variance
 - Transfer from Service WIP
 - Contract
 - Quarantine Receipt
 - Purchase Price Variance
 - Receipt
 - Rejection
 - Revaluation
 - Revenues
 - Revenues Analysis
 - Reverse Interim Result
 - Receipt Intercompany
 - Shipment Variance
 - Subcontracting
 - Subcontracting WIP
 - Rejection Intercompany
 - Subcontracting Intercompany
 - Operation Costs Intercompany
 - General Costs Work Order Intercompany
 - AFP Commitment
 
 - Subcontracting
 - 
                              
If this check box is selected, Infor LN prints the financial transactions for the selected range of standard or project subcontracting codes.
 - from
 - 
                              
The From and To fields define a range of: the standard or project subcontracting.
 - Posting Type
 - 
                              
The From and To fields define a range of: posting types for the subcontracting transactions.
Allowed values
- Additional Calculation Office Variance
 - Shipment Variance Intercompany (Project)
 - General Costs Intercompany
 - Material
 - Material Intercompany
 - Value Correction
 - Repair Warranty Costs
 - WIP Hours
 - Warranty Costs
 - WIP Costs (through Financials)
 - WIP Transfer Issue
 - WIP Transfer Receipt
 - WIP Transfer Receipt Intercompany
 - Warehouse Surcharge Issue
 - Warehouse Surcharge Receipt
 - Cost of Sales
 - Goodwill
 - Tool Costs
 - Tool Costs Intercompany
 - Issue Intercompany (Project)
 - Adjustment
 - Landed Costs
 - Landed Costs Variance
 - Landed Costs Invoiced
 - Landed Costs Variance Invoiced
 - Invoiced WIP
 - Issue (Project)
 - Loan Result
 - Sales Order Price Variance
 - COS Intercompany
 - Planned Stage Payment
 - Released Stage Payment
 - Receipt (Stage Payment)
 - Loan
 - Borrow
 - Payback Result
 - Receipt Variance (Stage Payment)
 - Cost Peg Reallocation (Stage Payment)
 - Currency Variance (Stage Payment)
 - Approval (Claim)
 - Expense Tax (Stage Payment)
 - Loan Reversal
 - Borrow Reversal
 - Currency Variance
 - WIP Quarantine Issue
 - Quarantine Adjustment
 - Currency Variance (Landed Costs)
 - Revenues Intercompany
 - COS Price Variance
 - WIP Costs Intercompany
 - WIP Hours Intercompany
 - Expenses Intercompany
 - Landed Costs Intercompany
 - Landed Costs Invoiced Intercompany
 - Receipt Intercompany (Stage Payment)
 - Direct Receipt Intercompany
 - Variance Intercompany
 - COS Variance
 - Work Order Price Variance
 - Cost of Sales Recognition
 - COS Invoiced (Project)
 - Soft Commitment (Project Control)
 - Soft Commitment (Project Control) - Rev
 - Receipt (Project Warehouse)
 - Matched Receipt
 - Project Control
 - Inventory
 - Cost Invoice
 - Price Variance - Rev
 - Expense Tax
 - Landed Costs Expense Tax
 - Purchase Invoice
 - Landed Costs without Invoice
 - Field Service Cost
 - Labor Cost
 - Hours (Subcontracting)
 - Manual Sales
 - Surcharge on Soft Commitment
 - Surcharge on Hard Commitment (Project)
 - Surcharge on Cost
 - Applied Overhead
 - Direct Delivery Issue
 - Stage Payment Invoice
 - Cost Peg Reallocation (Expense Tax)
 - Currency Gain and Loss
 - Direct Delivery Issue Intercompany
 - Direct Delivery Variance
 - Direct Delivery
 - Issue Result
 - Expenses
 - Variance Adjustment
 - Freight Price Variance
 - Field Change Order Costs
 - Freight Costs
 - General Costs Variance
 - General Costs (through Financials)
 - General Costs
 - General Costs Work Order
 - Interim Result
 - Issue
 - Issue Intercompany
 - Item Surcharge Receipt
 - Item Surcharge Issue
 - On Order
 - Operation Costs
 - Price Variance
 - Transfer from Service WIP
 - Contract
 - Quarantine Receipt
 - Purchase Price Variance
 - Receipt
 - Rejection
 - Revaluation
 - Revenues
 - Revenues Analysis
 - Reverse Interim Result
 - Receipt Intercompany
 - Shipment Variance
 - Subcontracting
 - Subcontracting WIP
 - Rejection Intercompany
 - Subcontracting Intercompany
 - Operation Costs Intercompany
 - General Costs Work Order Intercompany
 - AFP Commitment
 
 - Sundry Cost
 - 
                              
If this check box is selected, Infor LN prints the financial transactions for the selected range of standard or project sundry costs.
 - Sundry Cost
 - 
                              
The From and To fields define a range of: standard or project sundry costs.
 - Posting Type
 - 
                              
The From and To fields define a range of: posting types for the sundry cost transactions.
Allowed values
- Additional Calculation Office Variance
 - Shipment Variance Intercompany (Project)
 - General Costs Intercompany
 - Material
 - Material Intercompany
 - Value Correction
 - Repair Warranty Costs
 - WIP Hours
 - Warranty Costs
 - WIP Costs (through Financials)
 - WIP Transfer Issue
 - WIP Transfer Receipt
 - WIP Transfer Receipt Intercompany
 - Warehouse Surcharge Issue
 - Warehouse Surcharge Receipt
 - Cost of Sales
 - Goodwill
 - Tool Costs
 - Tool Costs Intercompany
 - Issue Intercompany (Project)
 - Adjustment
 - Landed Costs
 - Landed Costs Variance
 - Landed Costs Invoiced
 - Landed Costs Variance Invoiced
 - Invoiced WIP
 - Issue (Project)
 - Loan Result
 - Sales Order Price Variance
 - COS Intercompany
 - Planned Stage Payment
 - Released Stage Payment
 - Receipt (Stage Payment)
 - Loan
 - Borrow
 - Payback Result
 - Receipt Variance (Stage Payment)
 - Cost Peg Reallocation (Stage Payment)
 - Currency Variance (Stage Payment)
 - Approval (Claim)
 - Expense Tax (Stage Payment)
 - Loan Reversal
 - Borrow Reversal
 - Currency Variance
 - WIP Quarantine Issue
 - Quarantine Adjustment
 - Currency Variance (Landed Costs)
 - Revenues Intercompany
 - COS Price Variance
 - WIP Costs Intercompany
 - WIP Hours Intercompany
 - Expenses Intercompany
 - Landed Costs Intercompany
 - Landed Costs Invoiced Intercompany
 - Receipt Intercompany (Stage Payment)
 - Direct Receipt Intercompany
 - Variance Intercompany
 - COS Variance
 - Work Order Price Variance
 - Cost of Sales Recognition
 - COS Invoiced (Project)
 - Soft Commitment (Project Control)
 - Soft Commitment (Project Control) - Rev
 - Receipt (Project Warehouse)
 - Matched Receipt
 - Project Control
 - Inventory
 - Cost Invoice
 - Price Variance - Rev
 - Expense Tax
 - Landed Costs Expense Tax
 - Purchase Invoice
 - Landed Costs without Invoice
 - Field Service Cost
 - Labor Cost
 - Hours (Subcontracting)
 - Manual Sales
 - Surcharge on Soft Commitment
 - Surcharge on Hard Commitment (Project)
 - Surcharge on Cost
 - Applied Overhead
 - Direct Delivery Issue
 - Stage Payment Invoice
 - Cost Peg Reallocation (Expense Tax)
 - Currency Gain and Loss
 - Direct Delivery Issue Intercompany
 - Direct Delivery Variance
 - Direct Delivery
 - Issue Result
 - Expenses
 - Variance Adjustment
 - Freight Price Variance
 - Field Change Order Costs
 - Freight Costs
 - General Costs Variance
 - General Costs (through Financials)
 - General Costs
 - General Costs Work Order
 - Interim Result
 - Issue
 - Issue Intercompany
 - Item Surcharge Receipt
 - Item Surcharge Issue
 - On Order
 - Operation Costs
 - Price Variance
 - Transfer from Service WIP
 - Contract
 - Quarantine Receipt
 - Purchase Price Variance
 - Receipt
 - Rejection
 - Revaluation
 - Revenues
 - Revenues Analysis
 - Reverse Interim Result
 - Receipt Intercompany
 - Shipment Variance
 - Subcontracting
 - Subcontracting WIP
 - Rejection Intercompany
 - Subcontracting Intercompany
 - Operation Costs Intercompany
 - General Costs Work Order Intercompany
 - AFP Commitment
 
 - Overhead
 - 
                              
If this check box is selected, Infor LN prints the financial transactions for the selected range of standard overheads.
 - Overhead
 - 
                              
The From and To fields define a range of: the standard overheads
 - Posting Type
 - 
                              
The From and To fields define a range of: posting types for the overhead transactions.
Allowed values
- Additional Calculation Office Variance
 - Shipment Variance Intercompany (Project)
 - General Costs Intercompany
 - Material
 - Material Intercompany
 - Value Correction
 - Repair Warranty Costs
 - WIP Hours
 - Warranty Costs
 - WIP Costs (through Financials)
 - WIP Transfer Issue
 - WIP Transfer Receipt
 - WIP Transfer Receipt Intercompany
 - Warehouse Surcharge Issue
 - Warehouse Surcharge Receipt
 - Cost of Sales
 - Goodwill
 - Tool Costs
 - Tool Costs Intercompany
 - Issue Intercompany (Project)
 - Adjustment
 - Landed Costs
 - Landed Costs Variance
 - Landed Costs Invoiced
 - Landed Costs Variance Invoiced
 - Invoiced WIP
 - Issue (Project)
 - Loan Result
 - Sales Order Price Variance
 - COS Intercompany
 - Planned Stage Payment
 - Released Stage Payment
 - Receipt (Stage Payment)
 - Loan
 - Borrow
 - Payback Result
 - Receipt Variance (Stage Payment)
 - Cost Peg Reallocation (Stage Payment)
 - Currency Variance (Stage Payment)
 - Approval (Claim)
 - Expense Tax (Stage Payment)
 - Loan Reversal
 - Borrow Reversal
 - Currency Variance
 - WIP Quarantine Issue
 - Quarantine Adjustment
 - Currency Variance (Landed Costs)
 - Revenues Intercompany
 - COS Price Variance
 - WIP Costs Intercompany
 - WIP Hours Intercompany
 - Expenses Intercompany
 - Landed Costs Intercompany
 - Landed Costs Invoiced Intercompany
 - Receipt Intercompany (Stage Payment)
 - Direct Receipt Intercompany
 - Variance Intercompany
 - COS Variance
 - Work Order Price Variance
 - Cost of Sales Recognition
 - COS Invoiced (Project)
 - Soft Commitment (Project Control)
 - Soft Commitment (Project Control) - Rev
 - Receipt (Project Warehouse)
 - Matched Receipt
 - Project Control
 - Inventory
 - Cost Invoice
 - Price Variance - Rev
 - Expense Tax
 - Landed Costs Expense Tax
 - Purchase Invoice
 - Landed Costs without Invoice
 - Field Service Cost
 - Labor Cost
 - Hours (Subcontracting)
 - Manual Sales
 - Surcharge on Soft Commitment
 - Surcharge on Hard Commitment (Project)
 - Surcharge on Cost
 - Applied Overhead
 - Direct Delivery Issue
 - Stage Payment Invoice
 - Cost Peg Reallocation (Expense Tax)
 - Currency Gain and Loss
 - Direct Delivery Issue Intercompany
 - Direct Delivery Variance
 - Direct Delivery
 - Issue Result
 - Expenses
 - Variance Adjustment
 - Freight Price Variance
 - Field Change Order Costs
 - Freight Costs
 - General Costs Variance
 - General Costs (through Financials)
 - General Costs
 - General Costs Work Order
 - Interim Result
 - Issue
 - Issue Intercompany
 - Item Surcharge Receipt
 - Item Surcharge Issue
 - On Order
 - Operation Costs
 - Price Variance
 - Transfer from Service WIP
 - Contract
 - Quarantine Receipt
 - Purchase Price Variance
 - Receipt
 - Rejection
 - Revaluation
 - Revenues
 - Revenues Analysis
 - Reverse Interim Result
 - Receipt Intercompany
 - Shipment Variance
 - Subcontracting
 - Subcontracting WIP
 - Rejection Intercompany
 - Subcontracting Intercompany
 - Operation Costs Intercompany
 - General Costs Work Order Intercompany
 - AFP Commitment
 
 - Revenues
 - 
                              
If this check box is selected, Infor LN prints the financial transactions for the selected range of standard or project revenues.
 - Revenues
 - 
                              
The From and To fields define a range of: standard or project revenues.
 - Posting Type
 - 
                              
The From and To fields define a range of: posting types for the revenue transactions.
Allowed values
- Project Control
 - Invoice
 - Sales Invoice (Finance)
 - Invoice (Holdback)
 
 
 
 - Company
 - 
            
- Company
 - 
                     
- Company
 - 
                              
The From and To fields define a range of: companies for which the financial transactions are printed.
 - Delivering Company
 - 
                              
The From and To fields define a range of: delivering companies.
 
 - Invoice
 - 
                     
- Invoice Number
 - 
                              
The From and To fields define a range of: Invoice.
 - Invoice Number
 - 
                              
The From and To fields define a range of: transaction types.
 - Invoice Number
 - 
                              
The From and To fields define a range of: Invoice Document.
 - Document
 - 
                              
The From and To fields define a range of: Document.
 - Approved for Invoicing
 - 
                              
Indicates the transactions that are included in the report.
Allowed values
Following are the allowed values:
- 
                                    
No
Infor LN prints the financial transactions that are not approved for invoicing. - 
                                    
Yes
Infor LN prints the financial transactions that are approved for invoicing. - 
                                    
Both
Infor LN prints all the financial transactions. 
 - 
                                    
 - Transferred to Invoicing
 - 
                              
Indicates the transactions that are included in the report.
Allowed values
Following are the allowed values:
- 
                                    
No
Infor LN prints the financial transactions that are not transferred to invoicing. - 
                                    
Yes
Infor LN prints the financial transactions that are transferred to invoicing. - 
                                    
Both
Infor LN prints all the financial transactions. 
 - 
                                    
 
 - Contacts
 - 
                     
- Buy-from Business Partner
 - 
                              
The From and To fields define a range of: the buy-from business partners.
 - Invoice-from Business Partner
 - 
                              
The From and To fields define a range of: invoice-from business partners.
 - Invoice-to Business Partner
 - 
                              
The From and To fields define a range of: invoice-to business partners.
 - Employee
 - 
                              
The From and To fields define a range of: employees.
 
 
 - Processing
 - 
            
- Periods
 - 
                     
- Cost Control Period Table
 - 
                              
The From and To fields define a range of: period tables for the cost control periods.
 - Cost Control Period (Year)
 - 
                              
The From and To fields define a range of: cost control years for which the financial transactions are printed.
 - /
 - 
                              
The From and To fields define a range of: cost-control periods for which the financial transactions are printed.
 - Fiscal Period Table
 - 
                              
The From and To fields define a range of: period tables for the fiscal periods.
 - Fiscal Period (Year)
 - 
                              
The From and To fields define a range of: the year of the fiscal period for which the financial transactions are printed.
 - /
 - 
                              
The From and To fields define a range of: Fiscal Period for which the financial transactions are printed.
 - Hours Control Period Table
 - 
                              
The From and To fields define a range of: period tables for the hours-control periods.
 - Hours Control Period (Year)
 - 
                              
The From and To fields define a range of: the year of the hours-control period for which the financial transactions are printed.
 - /
 - 
                              
The From and To fields define a range of: hours-control periods for which the financial transactions are printed.
 
 - Dates/Times
 - 
                     
- Transaction Time
 - 
                              
The From and To fields define a range of: transaction dates and time.
 - Registration Date
 - 
                              
The From and To fields define a range of: the registration dates and time.
 - Processing Run From and To
 - 
                              
The From and To fields define a range of: the run dates when the financial transactions are processed.
 - Processing Run Number
 - 
                              
The From and To fields define a range of: the processing run numbers.
 - Run Date (R. Compl.) From
 - 
                              
The From and To fields define a range of: the processing run completion dates.
 - Processing Run Number
 - 
                              