Physical Progress by Extension/Equipment (tpppc1584m000)

Use this session to list the progress for the combination of the extension and the equipment cost object.

Field Information

Project

The project code.

Project Status

The project status.

Date

The date for which forecast will be generated.

Prog. Reg. Level

This field indicates whether the progress for the cost type Equipment is recorded in project monitoring by cost object or control code.

Extension

The extension code.

Extension Type

The status of the extension.

Extension Status

The status of the extension.

Equipment

The equipment code.

Budget Quantity

The total budgeted quantity as shown in the control data.

Reported Completed

If this check box is selected, the production of the selected element is assumed to be completed. If it is not completed, you can still enter a progress.

Phys. Progress [%]

The progress of the selected cost object or control code, expressed as a percentage of the total budgeted quantity or time.

Phys. Progress [Qty.]

The progress of the selected cost object or control code, expressed as a quantity or amount of time.