Work Cell - OEE (tirpt4540m000)
Field Information
- Site
 - 
            
The site ID.
Note: Only visible if multisite functionality is active. - Work Cell
 - Shift Start Date
 - 
            
The selected shift start date.
 - Shift
 - 
            
The shift ID.
 - Availability (%)
 - 
            
The percentage of time the selected work cell is available for production.
Availability% = Net Operating Time / Net Available Time * 100 - Performance (%)
 - 
            
The percentage of time the selected work cell is operational.
Performance% = Ideal Operating Time/ Net Operating Time * 100 - Quality (%)
 - 
            
The percentage of product manufactured correctly during operating time.
Quality% = (Ideal Operating Time - Lost Operating Time)/ Ideal Operating Time * 100 - OEE (%)
 - 
            
The overall equipment effectiveness of the work cell and shift.
Availability * Performance * Quality