Production Scheduler (tirpt4202m200)

Use this session to to schedule work cells.

Note: 
  • The scheduling logic is based on a finite forward calculation, with the 'earliest need date' principle to reduce the lateness in the planning. You can use available slack and buffer inventory to optimize production if necessary.
  • You can also view and manage the production schedule in the Production Scheduler Gantt (tirpt4202m251) graphical session.
  • If manual changes must be made to the production schedule, you can do this after the schedule is actualized.
  • If no session defaults are saved, schedule options are defaulted from the Repetitive Manufacturing Parameters (tirpt0100m000) session.

Field Information

Site

The site ID.

Note: Only visible if multisite functionality is active.

Shop Floor Planner

shop floor planner

Work Cell Plan Group

plan group

Move and Swap Runs

If this check box is selected, you can move and swap scheduled run positions to compensate for lateness in lines with an early need date.

Note: When this and Move and Swap Lines check boxes are selected, scheduling is based on the earliest need dates retrieved from Enterprise Planning .
Update Pegging

If this check box is selected, pegging relations are updated automatically when the schedule is generated.

Move and Swap Lines

If this check box is selected, you can move and swap line positions in the schedule to compensate for lateness, or changes in need dates.

Note: Selected automatically, If the Move and Swap Runs check box is selected. This also applies to clearing the check box.
Auto Confirm

If this check box is selected, the generated planning is automatically updated in the selected production schedule.

If this check box is cleared, you can use the Evaluate command to review the schedule in the planning board first. You can manually adjust the schedule if needed before it is updated.

Offload Runs

If this check box is selected, you can offload scheduled lines to another work cell to optimize the schedule.

Note: Only available if the Move and Swap Runs check box is selected.
Color Group

The code of the color group. The colors specified in this group, are used for the Gantt Chart type.

Cumulative Lateness

The total lateness in reporting items completed in hours.

The lateness is calculated over the whole plan group.