Shift - Materials (tirpt4121m100)
Use this session to maintain material for schedule lines that have the end item reported as complete for a specific work cell and shift.
- To return the already issued materials, select the material line and decrease the material quantity.
 - To issue more materials, select the material line and increase the material quantity.
 
Field Information
- Work Cell
 - 
            
The work cell code.
 - Shift
 - 
            
The shift name.
 - Product
 - 
            
The item that is produced.
 - Schedule
 - 
            
The ID of the schedule.
 - Line
 - 
            
The schedule line number.
 - Status
 - 
            
The shift status.
Allowed values
- Free
 - 
               
Run schedule is controlled by the planning engine.
 - Released
 - 
               
Run schedule complete, changes can only be made manually.
 - Active
 - 
               
Production run schedule is being implemented.
 - Production Completed
 - 
               
All schedule lines for the production run were completed, but the run has not been closed.
 - Completed
 - 
               
All schedule lines for the production run were completed, and all completed products were delivered into inventory. You can still account hours and issue materials for the run schedule.
 - Closed
 - 
               
The run schedule was completed, changes can no longer be made.
 
 - Position
 - 
            
The position number of the material line.
 - Material
 - 
            
The component item that is part of the manufactured item (the standard material) used in the specified shift.
 - Unit
 - 
            
The inventory unit for the material.
 - Net Quantity
 - 
            
The net quantity of the material needed for the production schedule line.
 - Actual Quantity
 - 
            
The actual quantity issued from inventory.
 - Scrap Percentage
 - Estimated Quantity
 - 
            
The estimated quantity of material required. This value is based on the Net Quantity specified for the particular production schedule line.
 - To Issue
 - 
            
The material quantity that must be issued. It is defined with the following formula:
Estimated - Backflushed - Point of Usage
 - 
            
The shop floor warehouse linked to the work station that contains the material for the production of the repetitive item.
 - Backflush
 - 
            
If this check box is selected, the schedule line materials are backflushed.