Work Centers by Plan Group (tirou0101m400)
Field Information
- Site
 - 
            
The ID of the site to which the plan group belongs.
 - Plan Group
 - 
            
The plan group ID.
 - Work Center
 - 
            
The work center ID and description.
 - Work Center Type
 - 
                     
The work center type.
Allowed values
- Work Center
 - 
               
A regular work center that defines an area, typically bounded by yellow lines, where job shop operations are done and machines are present.
 - Sub Work Center
 - 
               Note: If the value Job Shop by Site parameter is Active in the Implemented Software Components (tccom0100s000) session, this option is not available.
A work center that belongs to a higher-level work center in order to review aggregated capacity.
 - Subcontracting
 - 
               
If an operation must be subcontracted, a subcontracting work center must be defined. You cannot link operation-rate codes for this work-center type. However, you can record planning data by subcontracting work center, irrespective of the selected critical capacity type. If a work center is of the Subcontracting type, you cannot change the work-center type.
 - Costing
 - 
               
The work center is a costing work center.
 - Buffer
 - 
               
An assembly line work station where no operations are carried out, but orders wait pending transfer to the next work station.
 - Line Station
 - 
               
A work center that is part of an assembly line. A line station is used in the production of final assembly schedule items.
 - Work Cell
 - 
               
A grouping of one or more work stations in a fixed sequence defined in the Work Cells (tirpt0140m000) session, dedicated to repetitive manufacturing. Work cells are used for manufacturing items based on production models.