Production Order Operation Cost Distribution Changes (ticst1558m000)
Use this session to to view the operation cost distribution history.
Field Information
- Production Order
 - Version
 - 
            
The production order version ID.
Note: The Version Control check box in the Production Order Parameters (tisfc0100s000) session must be selected. - Distribution Line
 - 
                     
The number of the distribution line.
 - Date
 - 
            
The date for which you want to view the operation cost distribution.
 - Sequence Number
 - 
            
The sequence number of the operation. This number is based on the effective/expiry dates, and is used to distinguish between operations.
The effectivity and expiry date for operations are used in:
- Enterprise Planning
 - Standard Cost Calculation
 - Job Shop Control
 
 - User
 - 
            
The user who performed the action.
 - History Action
 - 
            
The action that was performed on the record.
Allowed values
- Created
 - Changed
 - Deleted
 - Canceled
 - Not Applicable
 
 - Reason
 - Site
 - 
            
The site ID.
Note: Only visible if multisite functionality is active. - Project Peg Origin
 - 
            
The origin of the project peg for the production order.
Allowed values
- Costing Break
 - Not Applicable
 - Manual
 - Top Demand