Standard Cost Scheme Details (ticpr0110m000)
Use this session to display or maintain the cost components that are linked to a specific scheme in the Item - Costing (ticpr0107m000) session.
Field Information
- Cost Component Scheme
 - 
            
The code under which cost components are collected.
 - Cost Component Type
 - 
            
The cost type defines the elements that make up the standard cost and the valuation price. Cost types indicate the type of costs that must be posted to a cost component.
Allowed values
- Operation Costs
 - 
               
You can link cost components of this cost type to:
- Subcontracting items
 - Operation-rate codes
 
 - Material Costs
 - 
               
You can link cost components of this cost type to:
- Standard items
 - Customized items
 - Calculation parts
 - Project items
 - Service items
 
 - Surcharge
 - 
               
Unspecified additional costs incurred during the manufacturing process.
 - Obsolete
 - 
               
You can use this cost type to define cost incurred, for example, when you transfer goods from one work center to another.
 - General Costs
 - 
               
You can link cost components of this cost type to:
- Cost items
 
Examples of general costs are: freight costs, purchase costs, traveling expenses, and so on.
 - Not Applicable
 - 
               
You must use this value for cost components that are used in Service and in Project .
 
 - Component Type
 - 
            
The type of cost component.
Allowed values
- Detail
 - 
               
Used to collect costs defined for the specified cost component.
Optional for a valid cost component scheme.
 - Collect
 - 
               
Used to define costs or rates that are not specifically defined in the cost component scheme. None-specific costs are collected on the related collect cost component.
Note: A valid cost component scheme must have one cost component of the type Collect with the General Costs. - Aggregated
 - 
               
Used to aggregate detail and collect cost components by type: materials, operations, surcharges and general. Each cost component scheme must have an aggregate cost component for each of the types.
Note: A valid cost component scheme must have aggregated cost components specified for all four component types. 
 - Cost Component
 - 
            
            
 - Collect in Scheme
 - 
            
Specify if the selected cost component is linked to a cost component scheme.
 - Type of Operation Costs
 - 
            
Specify the type of operation costs linked to the cost component.
Allowed values
- Labor
 - Not Applicable
 - Machine
 - Labor Overhead
 - Machine Overhead
 - Overhead
 - Subcontract
 - Not Specified
 
 - Fixed / Variable
 - 
            
Specify if the cost component is of the type fixed or variable.
 - Direct / Indirect
 - 
            
Specify if the cost component is for a direct or indirect cost.