Cost Component Scheme (ticpr0109m000)
Use this session to maintain standard cost component schemes.
Field Information
- Cost Component Scheme
 - 
            
The code under which cost components are collected.
You must link cost components to a scheme in the Standard Cost Scheme Details (ticpr0110m000) session.
 - Validated
 - 
            
If this check box is selected, the selected scheme is validated.
Note: A cost component scheme must be valid before it can be linked to an item. - Last Validation Date
 - 
            
The date validation was performed.
 - Modified
 - 
            
If this check box is selected, the cost components scheme is modified.
 - Last Modification Date
 - 
            
The date the cost component scheme was modified.