Failure Resolution (qmpqm1140m000)
Use this session to view and modify the faults and the failure resolution linked to a specified FMEA.
Field Information
- FMEA Number
 - 
            
The FMEA number that is generated for a specified structure.
Note: This field is defaulted from FMEA Number field in the FMEA Generation Structure (qmpqm1100m000) session. - Line
 - 
            
The failure mode for which failure resolution is provided.
 - Origin Order Sequence
 - 
            
The resolution sequence of the failure mode. Each failure mode can have multiple resolutions.
 - Severity Code
 - 
            
The code of the severity of the fault.
 - Description
 - 
            
The description or name of the code.
 - Severity Ranking
 - 
            
The value of the severity of the fault.
Note: This value is based on the Severity Code. - Critical Failure
 - 
            
If this check box is selected, the fault is a critical failure.
 - Potential Causes
 - 
            
The specific reason for the fault occurrence.
 - Occurrence Code
 - 
            
The code of the occurrence of the fault.
 - Description
 - 
            
The description or name of the code.
 - Occurrence Ranking
 - 
            
The ranking(probability) of the occurrence.
Note: This value is based on the Occurrence Code. - Current Controls
 - 
            
The procedure to prevent or detect the failure.
 - Detection Code
 - 
            
The detection code for a fault.
 - Description
 - 
            
The description or name of the code.
 - Detection Ranking
 - 
            
The ranking for a Detection Controls code.
Note: This value is based on the Detection Code. - Risk Priority Number
 - 
            
The value of the Risk Priority Number.
 - Recommended Actions
 - 
            
The text to indicated the recommended actions.
 - Person Responsible
 - 
            
The user id of the employee responsible for failure resolution.
 - Name
 - 
            
The description or name of the code.
 - Planned Completion Date
 - 
            
The date by which the FMEA must be completed.
 - Actions Taken
 - 
            
The status of the specific action implemented to reduce the risk to an acceptable level.
 - New Severity Code
 - 
            
The code of the Severity of the fault, after the recommended actions are implemented.
 - New Severity
 - 
            
The value of the severity of the fault.
Note: This value is based on the Severity Code. - New Occurrence Code
 - 
            
The code of the occurrence of the fault, after the recommended actions are implemented.
 - New Occurrence
 - 
            
The value of the Occurrence of the fault.
Note: This value is based on the Occurrence Code. - New Detection Code
 - 
            
The detection code for a fault, after the recommended actions are implemented.
 - New Detection
 - 
            
The value of the Detection Controls of the fault.
Note: This value is based on the Detection Code. - New Risk Priority Number
 - 
            
The Risk Priority Number, after the recommended actions are implemented.
 - Risk Priority Number Date
 - 
            
The date on which the current RPN is updated.
 - New Risk Priority Number Date
 - 
            
The date on which the new RPN is updated.
 - Report Number
 - 
            
The customer report number linked to the FMEA number.