Failure Resolution (qmpqm1140m000)

Use this session to view and modify the faults and the failure resolution linked to a specified FMEA.

Field Information

FMEA Number

The FMEA number that is generated for a specified structure.

Note: This field is defaulted from FMEA Number field in the FMEA Generation Structure (qmpqm1100m000) session.
Line

The failure mode for which failure resolution is provided.

Origin Order Sequence

The resolution sequence of the failure mode. Each failure mode can have multiple resolutions.

Severity Code

The code of the severity of the fault.

Description

The description or name of the code.

Severity Ranking

The value of the severity of the fault.

Note: This value is based on the Severity Code.
Critical Failure

If this check box is selected, the fault is a critical failure.

Potential Causes

The specific reason for the fault occurrence.

Occurrence Code

The code of the occurrence of the fault.

Description

The description or name of the code.

Occurrence Ranking

The ranking(probability) of the occurrence.

Note: This value is based on the Occurrence Code.
Current Controls

The procedure to prevent or detect the failure.

Detection Code

The detection code for a fault.

Description

The description or name of the code.

Detection Ranking

The ranking for a Detection Controls code.

Note: This value is based on the Detection Code.
Risk Priority Number

The value of the Risk Priority Number.

Recommended Actions

The text to indicated the recommended actions.

Person Responsible

The user id of the employee responsible for failure resolution.

Name

The description or name of the code.

Planned Completion Date

The date by which the FMEA must be completed.

Actions Taken

The status of the specific action implemented to reduce the risk to an acceptable level.

New Severity Code

The code of the Severity of the fault, after the recommended actions are implemented.

New Severity

The value of the severity of the fault.

Note: This value is based on the Severity Code.
New Occurrence Code

The code of the occurrence of the fault, after the recommended actions are implemented.

New Occurrence

The value of the Occurrence of the fault.

Note: This value is based on the Occurrence Code.
New Detection Code

The detection code for a fault, after the recommended actions are implemented.

New Detection

The value of the Detection Controls of the fault.

Note: This value is based on the Detection Code.
New Risk Priority Number

The Risk Priority Number, after the recommended actions are implemented.

Risk Priority Number Date

The date on which the current RPN is updated.

New Risk Priority Number Date

The date on which the new RPN is updated.

Report Number

The customer report number linked to the FMEA number.