Job Shop Planning Bill of Material (cprpd3646m000)
Use this session to insert, update or delete Job Shop Planning Bills of Material.
Note: This session can be accessed only if the Configurations by Site field is set to Active or Enterprise Model in Preparation in the Implemented Software Components (tccom0100s000) session.
Field Information
- Product
 - The code of main item of the job shop planning
            bill of material.Note: The product must be a generic plan item.
 - Production Site
 - The code of source site of the job shop planning
            bill of material.Note: This field is defaulted from the production site of the product.
 - Revision
 - The revision number of the job shop planning bill
            of material.Note: The revision number cannot be modified manually.
 - Status
 - 
            
The status of the job shop planning bill of material.
Note: The status cannot be modified manually.Allowed values
- New
 - Approved
 - Expired
 
 - BOM Quantity
 - The quantity of the job shop planning bill of
              material.Note:
- The BOM Quantity can be modified only if the status is New.
 - The BOM Quantity is defaulted with 1.0.
 - The BOM quantity needs to be rounded on the inventory unit.
 
 - Effective Date
 - The date and time from when the job shop planning
            bill of material is effective.Note:
- The effective date can be modified only if the Status is New.
 - The effective date is defaulted from the current date.
 
 - Expiry Date
 - The date and time up to which the job shop
            planning bill of material is effective.Note:
- The expiry date can be modified only if the Status is New.
 - The expiry date is defaulted with the maximum UTC date.
 - The expiry date must not fall before the effective date.
 
 - Created By
 - The employee who creates the job shop planning bill of material.
 - Created By Description
 - The description of theCreated By .
 - Created On
 - The date and time when job shop planning bill of material is created.
 - Approved By
 - The employee who approves the job shop planning bill of material.
 - Approved By Description
 - The description of the Approved By.
 - Approved On
 - The date and time when the job shop planning bill of material is approved.
 - Expired By
 - The employee by whom the job shop planning bill of material is set to Expired.
 - Expired By Description
 - The description of the Expired By.
 - Expired On
 - The date and time when the job shop planning bill of material is set to Expired.