Planned Downtime (ttaad5530m000)
Use this session to specify a planned downtime period.
Field Information
- Tenant
-
The tenant that has planned the downtime. The field is blank if the landlord has planned a general downtime. This field is only available in a multitenant environment.
This field is populated by the system and cannot be changed.
- Upgrade Date/Time
-
The start date/time of the downtime period. Jobs are not started if they, based on their expected duration, would still be running at the start of the downtime period.
- End Period
-
The end date/time of the downtime period. No jobs are started between Upgrade Date/Time and End Period.
This field is optional.
- Description
-
Short description for the downtime.
Default value
“Regular Downtime”