Check and Repair Project Cost Peg Transfer Balances (whwmd2260m100)

Use this session to check, and, if required, repair these types of project cost pegged inventory for the selected warehouses, projects, and items:

  • Project Cost Peg Transfer Allocated
  • Project Cost Peg Transfer On Order
  • Borrowed
  • Loaned

For the selected warehouses, projects, and items, LN compares the transfer quantity of the open cost peg transfer lines with the allocated and on order quantity of the project pegged inventory. If the project cost pegged inventory quantities are different, these quantities are replaced with the quantities of the open cost peg transfer lines.

The open cost peg transfer line quantities are displayed in the Project Cost Peg Transfer Lines (whinh1145m000) session. The project pegged inventory is displayed in the Project Pegged Inventory (whwmd2560m000) and Project Pegged Inventory - Detailed Views (whwmd2560m100) sessions.

For borrow/loan transfers, LN compares the outstanding payback quantities of the borrow/loan transfer lines with the borrowed and loaned inventory quantities. If the borrowed or loaned inventory quantities are different, these quantities are replaced with the outstanding borrowed and loaned quantities.

The outstanding borrowed and loaned quantities are displayed in the Outstanding Payback Quantity of the Borrow/Loan (whinh1146m000) session.

Field Information

If this check box is selected, only the differences the between existing inventory and the rebuilt inventory is printed (that is, if there is no difference between the existing quantity and the rebuilt quantity, the item is not printed).

Select Simulate to perform a trial run, that is, only print reports as specified before actually rebuilding the inventory quantities.

Select Update to actually rebuild the inventory quantities and print reports as specified.