Actual Cost Control Data for Monitoring

Infor LN allows you to generate the actual cost control data for a project that can be used for monitoring the project progress.

You can use the Build Actual Cost Control (tpppc4803m000) session to select the project for which the actual cost control data is generated. The actual cost control data is aggregated at the project level.

You can use these sessions in Infor LN to generate and maintain the control data for a project based on elements, activities, extension and various cost types:

  • The Control by Project/Material (tpppc4513m000) session to monitor the projects where the actual cost control is aggregated at the project or material control code level.
  • The Control by Project (tpppc4510m000) session to monitor the projects where the actual cost control is aggregated at the project level.
  • The Control by Project/Cost Type (tpppc4511m000) session to monitor the projects where the actual cost control is aggregated at the project or cost type level.
  • The Control by Project/Extension (tpppc4530m000) session to monitor the projects where the actual cost control is aggregated at the project or extension level in this session.
  • The Control by Project/Extension/Cost Type (tpppc4531m000) session to monitor the projects where the actual cost control is aggregated at the project or extension or cost type level.
  • The Control by Project/Extension/Cost Component (tpppc4532m000) session to monitor the projects where the actual cost control is aggregated at the project or extension or cost component level.
  • The Control by Project/Extension/Material (tpppc4533m000) session to monitor the projects where the actual cost control is aggregated at the project or extension or material control code level.
  • The Control by Project/Extension/Labor (tpppc4534m000) session to monitor the projects where the actual cost control is aggregated at the project or extension or labor control code level.
  • The Control by Project/Extension/Equipment (tpppc4535m000) session to monitor the projects where the actual cost control is aggregated at the project or extension or equipment control code level.
  • The Control by Project/Extension/Subcontracting (tpppc4536m000) session to monitor the projects where the actual cost control is aggregated at the project or extension or subcontracting control code level.
  • The Control by Project/Extension/Sundry Cost (tpppc4537m000) session to monitor the projects where the actual cost control is aggregated at the project or extension or sundry cost control code level.
  • The Control by Project/Sundry Cost (tpppc4517m000) session to monitor the projects where the actual cost control is aggregated at the project or sundry cost control code level.
  • The Control by Project/Element/Sundry Cost (tpppc4527m000) session to monitor the projects where the actual cost control is aggregated at the project or element or sundry cost control code level.
  • The Control by Project/Activity/Sundry Cost (tpppc4554m000) session to monitor the project where the actual cost control is aggregated at the project or activity or sundry cost control code level.
  • The Control by Project/Element (tpppc4520m000) session to monitor the projects where the actual cost control is aggregated at the project element level.
  • The Control by Project/Activity (tpppc4540m000) session to monitor the projects where the actual cost control is aggregated at the project activity level.