Budgeted Extension Costs (Equipment) (tpptc3532m000)

Use this session to list budgeted extensions of the equipment cost-type for the selected project and budget-cost analysis version.

Field Information

Project

The code that uniquely identifies the project.

Project Status

The project's status.

Budget Cost Analysis Version

The code that uniquely identifies the cost analysis.

Last Calculation Time

The date on which the latest budget-cost analysis was performed via the Generate Budget Cost Analysis (tpptc3200m000) session for the selected budget-cost analysis code.

Extension

The code that uniquely identifies the extension.

Currency

The default currency in the overview session is the project currency. Both in a dependent and in an independent currency system you can change this currency to other currencies with the Rotate Currency option <CTRL-R>.

The following sequence is applicable:

  1. Project currency
  2. Local currency
  3. Reporting currency 1
  4. Reporting currency 2
Note: Only the last three currencies are home currencies.
Equipment

The code that uniquely identifies the equipment.

Description

The description or name of the code.

Reference Type

The nature of the cost object.

Allowed values

Project

Specific to the selected project.

Standard

Common to all projects.

Amount of Time

The length of time the equipment is used.

Time Unit

The code that uniquely identifies the time unit.

Amount

The total cost of the budget line.