Print Activity Budget History (tpptc2425m000)
Use this session to print the history of transactions in activity budget lines and, in activity relationships, (optional).
This history is only kept if the Log History of Budget check box in the Project Budget Parameters (tpptc0100s000) session is selected.
You can specify the details for printing in terms of project, activity, line number, transaction date, and cost-type.
Field Information
-
- Budget Material Lines
-
If this check box is selected, budget lines with a material cost-type are included in the print.
- Budget Labor Lines
-
If this check box is selected, budget lines with a labor cost-type are included in the print.
- Budget Equipment Lines
-
If this check box is selected, budget lines with a equipment cost-type are included in the print.
- Budget Subcontracting Lines
-
If this check box is selected, budget lines with a subcontracting cost-type are included in the print.
- Budget Sundry Cost Lines
-
If this check box is selected, budget lines with a sundry costs cost-type are included in the print.
- Detailed Report
-
If this check box is selected, LN prints the details of the activity budget history. If this check box is cleared, LN prints a summary of the activity budget history.
- Text
-
If this check box is selected,, the print includes general texts that relate to the activities.