Structural Materials to be Settled by Element (tpppc3532m000)

Use this session to list element/structural material lines. To generate items from element budget lines, go to the Specific menu and start the Global Entry of Materials (tpppc3232m000) session.

Field Information

Project

The project code.

Project Status

The project status.

Material

The structural material for which the indices are recorded.

Item

The item's code.

Element

The element code.