Costing Breaks - Service Other Cost (tppdm3105m000)

Use this session to create and maintain the costing breaks for other depot repair and field service costs for the service of an item.

For a project involving depot repair and field service of Service item, you can create costing breaks for other costs for service of the item. You can create costing breaks for the depot repair service labor costs of the type tooling, subcontracting and other by the item group and the item, mapped to specific element or activity of the project.

Note: To manually copy the costing breaks to another project, select the Copy to other Project option on the Actions menu. The Copy to Other Project window opens wherein you can specify the target project code.

Field Information

Project

The code that identifies the project for which the costing breaks are created.

Note: You can also create costing breaks for blank projects (projects for which the project code is not specified). However, you must specify the standard element/activity to create the costing breaks.
Line

The line number of the costing break.

Cost Type

The service cost type for which the costing breaks are created.

Allowed values

These are the applicable cost types:

  • Tooling
  • Subcontracting
  • Other
  • Rental
Item Group

The specific item group by which the costing break is created.

Note: This field is enabled if the Cost Type field is set to Subcontracting or Other.
Item

The specific item for which the costing break is created.

Note: This field is disabled if you specify a value in the Item Group field.
Tool Serial

The tool serial number of the item for which the costing break is created.

Note: This field is enabled only if the Cost Type field is set to Tooling and a value is specified in the Item field.
Element

The element for which the costing break is created.

Note: You must specify a standard element and/or a standard activity for a blank project.
Description

The description or name of the code.

Activity

The activity for which the costing break is created.

Note: You must specify a standard element and/or a standard activity for a blank project.
Description

The description or name of the code.