Equipment (tppdm0512m000)
Use this session to list standard equipment cost objects, which you can define and modify in the Equipment (tppdm0112s000) session.
- If you started this session by zooming, you can only find and select a record.
- You can use the Project Equipment (tppdm6512m000) session to list and insert project-specific equipment cost objects.
Field Information
- Equipment
-
The code that identifies the equipment cost object.
- Description
-
The description or name of the code.
- Search Key
-
The search key associated with the cost object.
- Equipment Group
-
The equipment group to which the cost object belongs.
- Order System
-
The project order system uses the control data to order equipment . You can either generate orders by using the project requirement planning (PRP) or order manually.
- PRP: Only the PRP related items will be considered in the Generate Planned PRP Orders (tppss6200m000) session.
- Manually: Only items ordered manually will be considered in the Generate Purchase Budgets (tpptc4200m000) session.
- Price Policy
-
Infor LN selects this check box to indicate that the default price policy used in actual budgets for this cost object. The value entered here is taken as the default in the session Element Budget (Equipment) (tpptc1112s000).
- Control Code
-
The control code for the cost object.
- Control Function
-
The function of the cost object for cost control purposes.
Allowed values
- Cost Object
- Cost Object/Control Code
- Control Code
- Cost Component
-
The cost component linked to the cost object.
Note: You can only specify a cost component for which the Component Type is set to Detail or Collect in the Cost Components (tcmcs0148m000) session. - Cost Rate
-
The default cost rate per time unit for this cost object.
- Cost Rate Currency
-
The currency used to express the cost rate.
- Sales Rate
-
The default sales rate, per time unit, of the cost object.
- Sales Rate Currency
-
The currency used to express the sales rate.
- External Equipment
-
If this check box is selected, the equipment is external. For example, rented or hired. PRP orders can be generated only for the external equipment.
Note: You can modify this setting in the budget, for example, if all your cranes are already in use and you need to rent or hire the same kind of crane. - Self-Propelled
-
Indicates if the project equipment (truck or excavator) has self-propelling ability. By default, this check box is cleared.
- Serialized
-
If this check box is selected, the equipment is a serialized item. When a standard equipment cost object is added, the item details are populated in the Items (tcibd0501m000) session.
Note:This check box is enabled only if:
- The serial number for the specific equipment is not specified in the Serialized Items (tcibd4501m000) session.
- The equipment is not used in:
- Costs
- Requirement Planning (PRP)
- Service
- Buy-from Business Partner
-
The buy-from business partner for the equipment.
- Calendar
-
The code that uniquely identifies the calendar linked to the equipment.
- Availability Type
-
The availability type for the calendar.
Note: This field is enabled only if a value is specified in the Calendar field. - Register Progress
-
If this check box is selected, progress for the cost object for the duration of the project can be recorded.
- Used in Schedule
-
If this check box is selected, the cost object can be used in an ESP (external scheduling package).
- Billable
-
If this check box is selected, the equipment cost object can be invoiced to the customer.
- General
-
If this check box is selected, a text is present.
- Product Type
-
product type
- Product Class
-
product class
- Product Line
-
product line
- Manufacturer
-
The items' default manufacturer.
- Technical Coordinator
-
The employee who is responsible for maintaining the technical item specifications and the requirements for the manufacturer of the item.
- Weight
-
The item's weight, expressed in the item's weight unit. This information is required on the intrastat report.
- Weight Unit
-
The weight unit in which the item's weight is expressed on the intrastat report. For details, see EU transaction reporting.
- Material
-
The material of which the item is composed. This field is only used for information.
- Size
-
The item's size. This field is only used for information.
- Standard
-
The industrial standard used to produce or purchase the item. For example, NEN3140 or ISO9000. This field is only used for information.
- Country of Origin
-
The country where the item was originally manufactured.
This field is used on Intrastat declarations.
- EAN Code
-
The bar code used to register the item.
- Environmental Compliance
-
Worldwide, various regulations exist to limit the use of hazardous chemical substances in electronic equipment preventing environmental pollution.
Companies, in most cases producers of electronic equipment, are legally required to:
- Set up and control compliancy rules.
- Verify whether purchased, engineered, manufactured, and serviced material is compliant.
- Verify whether their work processes are compliant.
This field indicates the item's environmental compliancy. The value in this field can be set by an external software application.
- Harmonized System Code
-
harmonized system code
- Extra Information
-
The additional information about the item.
- Responsible Department
-
The department to which the cost object belongs.
- Planner
-
The planner.
- Operated Equipment
-
If this check box is selected, Infor LN allocates the equipment with an assigned employee to operate the same. This field is only used for information.