Planning Tools Globally

If the tool serial number is planned in the Estimated Tool Requirements (titrp0111m000) session, you do not need to run this session.

Specify the order type, order, operation, activity line, or line number ranges. If you click Plan Tools, LN scans all tool types linked to the order, and plans the tool types for which the tool-serial number is not present.

Note: If no tools of the required tool type are available, the alternative tool type is planned based on the required tool usages, planning method, and maximum tools to be planned. If the required usages for a tool type are not fulfilled by the maximum number of tools specified, no tools are planned for that requirement.