Generating Work Center Input/Output Control

The data LN generates is determined by the following fields in the Production Order Parameters (tisfc0100s000) session:

  • Update Method I/O Control: determines whether the target period is a number of weeks or a number of days.
  • No. of Periods to Generate I/O Data: determines how many days or weeks the target period contains.
  • Include Partial Completions (Default): determines whether or not LN must take into account routing operations that are only partially completed to calculate input / output values.
Note: For a work center to be taken into account for input/output control, you must select the Critical in Master Planning check box in the Work Centers (tirou0101m000) details session.

Related sessions

  • You can delete data which you no longer require with the Delete Work Center Input/Output Control (tisfc3212m000) session.
  • You can generate input/output data for machines with the Generate Machine Input/Output Control Data (tisfc3220m000) session.