Subcontracting Models (tisub1100m000)
Use this session to manage models for subcontracting products or intermediate products.
Field Information
- Product
-
The subcontracted item.
- Subcontractor
-
subcontractor
- Subcontractor Site
-
The ID of the location where the subcontracted production takes place.
- Ship-from Business Partner
-
The business partner who ships the (intermediate) product.
- Revision
-
The revision ID.
- Production Site
-
The site ID.
- Effective Date
-
The date and time the subcontracting model is valid.
- Expiry Date
-
The date and time the subcontracting model is no longer valid.
- Status
-
The status of the subcontracting model.
Allowed values
- New
- Approved
- Expired
- Capacity / Week
-
The weekly capacity of the subcontracting location. This value is used in planning to analyze the availability of the subcontractor.
- Available for Planning
-
If this check box is selected, the subcontracted model is available to be used in planning.
- Use for Planning
-
If this check box is selected, the subcontracting model is used for planning.
- Use for Costing
-
If this check box is selected, the subcontracting model is enabled for costing, and for use in the calculation of the standard cost of a subcontracting item.
- Subcontractor Warehouse
-
The warehouse where the component is stored and where the allocation for a production order is made.
Note: If the component is a phantom, and you select the Inherit Warehouse if Parent Item is a Phantom check box, LN allocates the requirement for the component in the warehouse of the component's parent item. - Subcontracting Cluster
-
The planning cluster to which the subcontractor belongs.
- BOM Quantity
-
BOM quantity
- Source
-
The source of the subcontracting model.
Allowed values
- Manual
-
The P-BOM is defined in the Production Bills of Material (timfc3100m000) session.
- Production Bill of Material
-
The P-BOM revision was generated from an existing production bill of material.
- Engineering Bill of Material
-
The P-BOM is generated from an engineering bill of material.
Note: If the P-BOM is generated from an E-BOM, the Source Engineering Item and Source Revision fields are filled. - Configurator (PCF)
-
The P-BOM is generated from data imported from the PCF configurator.
- Configurator
-
The P-BOM is generated from data imported from Infor Configurator.
- PLM
-
The P-BOM is generated from data imported from PLM.
- Job Shop Bill of Material
-
The P-BOM was generated from a job shop bill of material.
- Not Specified
- Source Revision
- Lead Time Type
-
Specify the type of lead time used for the subcontracting model.
Allowed values
- Fixed
- Proportional
- Fixed Supply Time
-
If the lead time type is Fixed, the supply time does not depend on the ordered quantity.
- Supply Time
-
If the lead time type is Proportional, the supply time needed per unit. The supply time will increase with the number of units.
- Actual Calendar
-
The actual calendar used by the subcontracting model.
- Origin
- Created On
-
The date the selected subcontracting model was created.
- Created By
-
The employee who created the selected subcontracting model.
- Approved On
-
The date the selected subcontracting model was approved for use.
- Approved By
-
The employee who approved the selected subcontracting model for use.
- Expired On
-
The date the selected subcontracting model was expired and could no longer be used.
- Expired By
-
The employee who expired the selected subcontracting model.