Subcontractor 360 (tisub0330m000)

Use this session to manage subcontractors for a selected site.

The subcontract locations are shown per production site.

Field Information

Planning Cluster

The planning cluster for which you want to display the subcontractor locations or production sites.

Production Site

The ID of the site where the subcontracting work is performed.

Note: 

This filter is optional.

If no production site is selected, the default production site specified in the production user profile is used.

Model
Location

If this check box is selected, subcontractor locations are present.

Click on the link to open the Subcontractor Location (tisub0625m000) session.

Operation Subcontracting

If this check box is selected, operation subcontracting is active for the selected planning cluster and production site.

Click on the link to open the Operation Subcontractors List (tisub2100m000) session.

Product Subcontracting

If this check box is selected, product subcontracting is active for the selected planning cluster and production site.

Click on the link to open the Product Subcontractors List (tisub1100m000) session.

Planning
Resource Capacity

If this check box is selected, resource capacity is present at the selected subcontractor site.

Click on the link to open the Resource Capacities (cprpd2602m000) session.

Orders
Subcontracted Operations

If this check box is selected, subcontracted operations are present for the selected subcontractor site.

Click on the link to open the Subcontracted Operations (tisfc2110m000) session.

Purchase Orders

If this check box is selected, the purchase orders for the subcontractor and site are displayed.

Click on the link to open the Purchase Order Intake Workbench (tdpur4601m200) session.

Subcontractor

The subcontractor ID.

Subcontractor Cluster

The planning cluster to which the subcontractor site belongs.

Subcontractor Site

The ID of the site that belongs to the subcontractor.

Production Site

The ID of the site for which subcontracting is done.

Transportation Time Method

The method by which the transportation time is defined is:

Allowed values

  • Derived
  • Manual
  • Not Applicable
Ship-to Carrier

The carrier responsible for the transport of the intermediate product or materials to the subcontractor.

Transportation Time To

The time needed to transport the intermediate product or materials to the subcontractor site.

Time Unit To

The time unit in which the transportation time is expressed is:

Allowed values

  • Hours
  • Days
Ship-from Carrier

The carrier responsible for the transport of the subcontracted item from the subcontractor.

Transportation Time From

The time needed to transport the (intermediate) product to the subcontractor site.

Time Unit From

The time unit in which the transportation time is expressed is:

Allowed values

  • Hours
  • Days