Production Bill of Material (timfc3600m000)

Use this session to manage materials for the production bill of material.

This session displays data from

  • The Production Bill of Material Lines (timfc3110m000) session.
Note: To use this session the Job Shop by Site parameter in the Concept Activation (tcemm4600m000) session must be set to Active or In Preparation.

Field Information

Product

The product ID.

BOM Quantity

BOM quantity

Revision

The bill of material (BOM) revision.

Status

The status of the production bill of material.

Allowed values

  • New
  • Approved
  • Expired
Effective Date

The date the P-BOM becomes effective.

Source

The origin of the P-BOM.

Allowed values

Manual

The P-BOM is defined in the Production Bills of Material (timfc3100m000) session.

Production Bill of Material

The P-BOM revision was generated from an existing production bill of material.

Engineering Bill of Material

The P-BOM is generated from an engineering bill of material.

Note: If the P-BOM is generated from an E-BOM, the Source Engineering Item and Source Revision fields are filled.
Configurator (PCF)

The P-BOM is generated from data imported from the PCF configurator.

Configurator

The P-BOM is generated from data imported from Infor Configurator.

PLM

The P-BOM is generated from data imported from PLM.

Job Shop Bill of Material

The P-BOM was generated from a job shop bill of material.

Not Specified
Source Engineering Item

The item for which the Engineering Bill of Material is defined.

Note: If the P-BOM is created by EDM based on an engineering item- Item Relationship, this field specifies the engineering item.

Source Revision

The revision of the engineering item bill of material.

Expiry Date

The date the P-BOM can no longer be used.

Created By

The name of the employee responsible for the creation of the PBOM.

Created On

The date the PBOM was created.

Approved By

The employee responsible for the approval of the production bill of material.

Approved On

The date the production bill of material was approved.

Expired By

The eployee responsible for expiring the production bill of material.

Expired On

The date the production bill of material was expired.