Received Job Shop Bill of Material (tibom5605m000)
Field Information
- Site
-
Select the site where the job shop bill of material will be used.
- Site is
-
The site where the job shop bill of material is:
Allowed values
- Controlled by PLM
- Product
-
Select the product to which the job shop bill of material applies.
- Product is
-
The product is:
Allowed values
- Controlled by PLM
- Bill of Material
-
The ID of bill of material (BOM) the job shop bill of material is derived from.
- Bill of Material is
-
The job shop bill of material (BOM) is:
Allowed values
- Controlled by PLM
- Revision
-
The revision number of the selected bill of material (BOM).
- Revision is
-
The bill of material (BOM) revision is:
Allowed values
- Controlled by PLM
- Status
-
The status of the job shop bill of material.
Allowed values
-
Created
The job shop bill of material but has not yet been processed. -
Processed
The job shop bill of material has been processed and can be used. -
Rejected
The job shop bill of material has been rejected and must be reworded before it can be processed again.
-
- Routing
-
The routing used for production based on the job shop bill of material.
- Routing is
-
The routing used for the specified job shop bill of material is:
Allowed values
- Controlled by LN
- Controlled by PLM
- BOM Quantity
-
The BOM quantity for the job shop bill of material.
- BOM Quantity is
-
The specified BOM quantity is:
Allowed values
- Controlled by PLM
- BOM Text
-
If this check box is selected, bill of material text is present.
- BOM Text is
-
The presence of BOM text is:
Allowed values
- Controlled by LN
- Controlled by PLM
- Use for Planning
-
Specifies if the selected job shop bill of material is used for planning purposes.
- Use for Planning is
-
Use in planning is:
Allowed values
- Controlled by LN
- Use for Costing
-
Specifies if the selected job shop bill of material is used for costing purposes.
- Use for Costing is
-
Use in costing is:
Allowed values
- Controlled by LN
- Effective Date
-
The date the job shop bill of material becomes effective.
- Effective Date is
-
The effective date is:
Allowed values
- Controlled by PLM
- Expiry Date
-
The date after which the job shop of material is no longer effective.
- Expiry Date is
-
The expiry date is:
Allowed values
- Controlled by PLM
- Created By
-
The name of the employee who generated the job shop bill of material.
- Created On
-
The date and time the job shop bill of material was created.
- Processed By
-
The name of the employee who processed the job shop bill of material.
- Processed On
-
The date and time the job shop of material was processed.
- Rejected By
-
The name of the employee who rejected the job shop bill of material.
- Rejected On
-
The date and time the job shop bill of material was rejected.