Alternative materials JSBOM

You can set up and manage alternative materials for Job Shop BOMs in the following way:
Note: 
  • If multisite functionality is active, standard and alternative materials are managed for a specific planning cluster.
  • Alternative materials apply for production orders only, not for subcontracted purchase order.
  • You must distinguish the alternative materials, described in this topic, from the alternative items that you define in the Alternative Items (tcibd0505m000) session.
  • The standard cost calculation does not take alternative materials into consideration. Calculations are done based on the cost of the material specified in the JSBOM.

Restrictions

  • Alternative materials have the same net quantity as the standard material.
  • Alternative materials have exactly the same values of characteristics such as the scrap and yield as the standard material.
  • Use-up materials and alternative materials have the same material-routing relationships as the standard item.
  • If a component on a BOM line is a standard item, that is, an item with an empty project segment, the associated alternative materials must also be standard components.
  • If a component on a BOM line is a project item, that is, an item with a filled project segment, the associated alternative materials' project segments must be either:

    • Filled with the same project as the main item's project segment.
    • Empty (the alternative is a standard item)
  • If a component on a BOM line is a phantom, you cannot define alternative material for that component.
  • Priority of an alternative material

    You can specify the priority of each alternative material. If the standard material is out of stock, LN first tries the highest-priority alternative. If that material is also unavailable, LN tries the alternative that has the next priority.

  • To distribute a material requirement over multiple items

    If, on a BOM line in the Job Shop List of Material (tibom3610m000) session, the Allow Multiple Alternatives check box is selected, LN can split a material requirement over multiple alternative materials or partly fulfilled by the materials.

    Example: If ten pieces are needed and only six pieces of the requested material are available, first the six pieces of the original are used then four pieces of the alternative to fill the full quota.

  • Checks for alternative materials

    At one or more of the following points in a production order's life cycle, depending on parameter settings, LN can check whether an alternative material must be used:

    • When you generate planned production orders in Enterprise Planning.
    • When a production order is created in Job Shop Control.
    • When you run the Generate Alternatives for Estimated Materials (ticst0216m000) session for existing production orders.
    • When you generate an outbound advice in Warehousing.

    For more details, refer to the Searching for alternative materials topic.