Integrate and/or Post Cost Allocation Results (tfcat4211m000)

Use this session to integrate the results in the applicable module.

After the integration, LN:

  • Sets the Integrate into field to the corresponding module.
  • Selects the Costs definitive check box.
Relation Integrated into
Budget Year Single Dimension Budget per Year
Budget Period Single Dimension Budget per Period
Actual  
Integrate with CAT Actual Costs by Reference Unit
Integrate with GLD Documents, Batch Status, Non-finalized Transactions

LN cannot integrate the results of budget relations with a finalized budget.

Integrated data

  • Budget Year: Fixed, variable, and total amounts and cost rates/surcharges, variability.
  • Budget Period: Fixed, variable, and total amounts, variability.
  • Actual: Fixed, variable, and total amounts and cost rates/surcharges, variability.

Field Information

Flexible Budget

The iteration results are integrated into the Financial Budgeting System module.

Cost Analysis

The iteration results are integrated into the Cost Accounting module.

General Ledger

Select this check box to integrate the results in the General Ledger module.

Delete after Integration

If this check box is selected, the iteration data is removed from the iteration tables after it has been integrated.