Generating subcontracting rates

If the Resources by Site concept is inactive, you can define subcontracting rates in the Subcontracting Rates (ticpr1160m000) session and the Subcontracting Rates by Project (tipcs1160m000) session. Alternatively, you can define subcontracting rates for project items by defining cost calculation codes for specific projects.

When the Resources by Site concept is active, subcontracting rates for standard items and for project items are defined in the Operation Subcontracting Rates (ticpr1161m000) session, but you can still define subcontracting rates for project items by defining cost calculation codes for specific projects.

To generate subcontracting rates for the Operation Subcontracting Rates (ticpr1161m000) session, the Generate Subcontracting Rates (ticpr1261m000) session is used.

Using the Generate Subcontracting Rates (ticpr1261m000) session

In the Generate Subcontracting Rates (ticpr1261m000) session, you can use these options to specify the source from which the subcontracting rates are to be retrieved:

  • Select the Project Specific Rates check box if the subcontracting rates must be generated from a specific project.
  • In the Project (PCS) field, select the project from which the subcontracting rates must be generated.
  • In the Cost Calculation Code range fields, specify the range of cost calculation codes of the subcontracting rates from which the subcontracting rates must be generated. These are the cost calculation codes from the Subcontracting Rates (ticpr1160m000) session.

In these fields, you can specify the objects for which the subcontracting rates must be generated:

  • In the Subcontractor range fields, specify the range of subcontractors for whom the subcontracting rates must be generated.
  • In the Reference Operation range fields, specify the range of reference operations for which the subcontracting rates must be generated.
  • In the From Item range fields, specify the range of items for which the subcontracting rates must be generated.