Sub-Task Details (ttspt2535m100)
Use this session to view details of a sub-task.
Actions/Reference menu
This option is available:
- Starts a dialog box where you can update the data range to be handled by the selected sub-task.
- Package Combination
-
The package combination for which the data upgrade run will perform an upgrade.
- Run Number
-
The run number of the data upgrade run.
- Company
-
The company for which the data upgrade run will perform an upgrade.
- Upgrade Program
-
The package code of the upgrade program.
-
The module code of the upgrade program.
-
The library code of the upgrade program.
- Sub-Task
-
The sequence number of the sub-task.
- From
-
The first value in the data range of field 1 for the sub-task.
- From
-
The first value in the data range of field 2 for the sub-task.
- From
-
The first value in the data range of field 3 for the sub-task.
- To
-
The last value in the data range of field 1 for the sub-task.
- To
-
The last value in the data range of field 2 for the sub-task.
- To
-
The last value in the data range of field 3 for the sub-task.
- Real Run Status
-
The Real status of the sub-task.
Allowed values
Initialized The characteristics of the UDLL sub-task have been retrieved and are stored in the other fields of the record. Running The UDLL sub-task is running. Failed The UDLL sub-task finished with errors, or aborted. If one sub-task has the Failed status, the task gets the Failed status. Completed The UDLL sub-task finished correctly, but the same upgrade step may be present for other companies for which the tables are logically linked. When all sub-tasks of a task have the Completed status, the task gets the Completed status. Released The UDLL sub-task succeeded. When all sub-tasks of a task have the Released status, the task gets the Released status. - Server Number
-
The actual server (bshell) where the sub-task was executed last time.
- Result Description
-
A short description of the result of the upgrade program's execution.
- Number of Restarts
-
The number of times the sub-task was started before it succeeded.
- Attention Needed
-
If this check box is selected, the sub-task requires additional actions, although it may have succeeded.
- Logfiles Present
-
If this check box is selected, the upgrade program created log files during its execution.
- First Start Date
-
The date and time the upgrade program was executed for the first time.
- Last Start Date
-
The date and time the upgrade program was executed for the last time.
- Last Failure Date
-
The date and time the last failure occurred during execution of the upgrade program.
- Completion Date
-
The date and time the Real Run Status of the upgrade program was set to Completed.
- Release Date
-
The date and time the upgrade program succeeded.
- Simulation Run Status
-
The Simulation status of the Upgrade Step.
Allowed values
See Run Status.
- Server Number
-
The actual server (bshell) where the sub-task was executed last time.
- Result Description
-
A short description of the result of the upgrade program's execution.
- Number of Restarts
-
The number of times the sub-task was started before it succeeded.
- Attention Needed
-
If this check box is selected, the sub-task requires additional actions, although it may have succeeded.
- Logfiles Present
-
If this check box is selected, the upgrade program created log files during its execution.
- First Start Date
-
The date and time the upgrade program was executed for the first time.
- Last Start Date
-
The date and time the upgrade program was executed for the last time.
- Last Failure Date
-
The date and time the last failure occurred during execution of the upgrade program.
- Completion Date
-
The date and time the Real Run Status of the upgrade program was set to Completed.
- Release Date
-
The date and time the upgrade program succeeded.