Companies by Data Upgrade Run (ttspt2510m000)
Actions/Reference menu
These options are available:
-
Starts the Data Upgrade Tasks (ttspt2520m000) session.
-
Starts the Move Companies to Another Run (ttspt2210m000) session.
- Package Combination
-
The package combination for which the data upgrade run will perform an upgrade.
- Run Number
-
The run number of the data upgrade run.
- Company
-
The company for which the data upgrade run will perform an upgrade.
- Real Run Status
-
The actual run status of the company.
Possible values
Created The run was created by an external process, such as a PMC Feature Pack installation. Initialized The detailed data about the upgrade programs has been retrieved and is stored in the Data Upgrade Tasks (ttspt220) table. Running The run is busy. No failing upgrade programs have been detected yet. Running with Failures The run is busy. One or more failing upgrade programs have been detected. Failed The run finished with failures. Some upgrade programs may not have been executed because a pre-requisite failed. Partially completed The run finished without failures. Not all companies in the range have been processed, or the user stopped the process. Completed All upgrade programs succeeded. The upgrade is still running for physical companies. Released All upgrade programs succeeded. - Attention Needed
-
If this check box is selected, the company has one or more upgrade tasks that require additional actions.
- Creation Date
-
The date and time the run was created for the company.
- Initialization Date
-
The date and time the run was initialized for the company.
- First Start Date
-
The date and time the run was executed for the first time for the company.
- Last Failure Date
-
The date and time the last failure occurred during execution of the run for the company.
- Release Date
-
The date and time the run was finished for the company.
- Simulation Run Status
-
The status of the simulation run.
Possible values
- Attention Needed
-
If this check box is selected, the company has one or more upgrade tasks that require additional actions.
- Creation Date
-
The date and time the simulation run was created for the company.
- Initialization Date
-
The date and time the simulation run was initialized for the company.
- First Start Date
-
The date and time the simulation run was executed for the first time for the company.
- Last Failure Date
-
The date and time the last failure occurred during execution of the simulation run for the company.
- Release Date
-
The date and time the simulation run was finished for the company.