Planned Downtime (ttaad5530m000)

Use this session to specify a planned downtime period.

Tenant

The tenant that has planned the downtime. The field is blank if the landlord has planned a general downtime. This field is only available in a multitenant environment.

This field is populated by the system and cannot be changed.

Upgrade Date/Time

The start date/time of the downtime period. Jobs are not started if they, based on their expected duration, would still be running at the start of the downtime period.

End Period

The end date/time of the downtime period. No jobs are started between Upgrade Date/Time and End Period.

This field is optional.

Description

Short description for the downtime.

Default value

“Regular Downtime”