Groups for Quality (tsspc3100m500)
Use this session to view and modify the group planning data for Non-Conformance Report and Corrective Action Plan.
- The Plan Groups and Activity Sets option is displayed, only if the Planned by Origin check box for the non-conformance or the corrective action plan is cleared on the Quality tab in the Resource Planning Parameters (tsspc0101m000) session.
- This session is displayed in:
- The Groups for Quality - Resource Requirements (tsspc3604m902) session.
- The Groups for Quality - Proposed Resources (tsspc3604m903) session.
Field Information
- Start Date Groups
-
The start date of the group. Infor LN displays the details of the groups with a start date later than the specified date.
- Finish Date Groups
-
The finish date of the group. Infor LN displays the details of the groups with a finish date earlier than the specified date.
- Allocated Engineer
-
The code of the allocated service engineer based on which the group data is filtered.
- Group Set
-
The unique ID of the group set for which the attribute values are specified.
- Group
-
The unique ID of the group.
- Activity Origin
-
The origin of the activity.
Allowed values
- Service Order
- Work Order
- Planned Activity
- Project
- Non-Conformance Report
- Corrective Action Plan
- Job Shop Order
- Project (PCS)
- Check Resources for Attribute Values
-
If this check box is selected, Infor LN allocates resources for the Non-Conformance Report and Corrective Action Plan based on the attribute values.
- Check Resources for Skills
-
If this check box is selected, Infor LN allocates resources for the Non-Conformance Report and Corrective Action Plan based on the skills.
- Check Resources for Availability
-
If this check box is selected, Infor LN checks the availability of resources for the Non-Conformance Report and Corrective Action Plan.
- Minimum Availability Percentage
-
The minimum availability percentage of the resource for the allocation.
- Group Status
-
The least possible status of all the activities in the group.
Allowed values
- Created
-
The activity is imported from service order activity, work order activity or planned activity. The activity is yet to be planned.
- Planned
-
The activity is successfully planned (planning times are updated). The updated start and finish times can be copied to the service order activity, work order activity or planned activity.
- Not Planned
-
The activity could not be planned. Owing to failure of the planning process, the activity must be re-planned.
- Released
-
The updated start and finish times of the activity are copied to the service order activity, work order activity or planned activity.
- Maximum NCR/CAP Status
-
The highest possible status of all the activities in the group.
- Frozen
-
If this check box is selected, the group is frozen and you cannot add new groups to the existing groups.
- Firm Planned
-
If this check box is selected, the group is firm planned and you cannot modify the start and finish date of the group.
- Sort Method
-
The sorting method for the Non-Conformance Report and Corrective Action Plan activities in an activity set.
Allowed values
- Earliest Start
- Latest Finish
- Latest Start
- Planned Start
- Planned Finish
- Keep Sequence of Activity Sets
-
If this check box is selected, Infor LN does not change the sequence of the activity sets when the specified group is planned.
- Planned Start Time
-
The planned start date and time of the first activity set in the specified group.
- Planned Finish Time
-
The planned finish date and time of the last activity set in the specified group.
- Plan Method
-
The method to plan the Non-Conformance Report and Corrective Action Plan activities.
Allowed values
- Planning Based on Time
- Planning Based on Route
- Total Activity Duration
-
The cumulative duration of activities for all the activity sets in the group.
- Allocated Engineer
-
The engineer allocated to the specified group.