Preventive Maintenance Scenario Line Patterns (tsspc1132m000)
Use this session to create and maintain patterns based on which planned activities are generated.
Field Information
- Maintenance Scenario
 - 
            
The series code that identifies the maintenance scenario.
 - Description
 - 
            
The description or name of the code.
 - Line
 - 
            
The maintenance scenario line number.
 - Sequence
 - 
            
The sequence allows multiple pattern lines under the same scenario line.
 - Reference Activity
 - 
            
The reference activity from which a planned activity is to be generated.
 - Description
 - 
            
The description or name of the code.
 - Activity Type
 - 
            
Indicate the activity type from which the planned activities can be generated.
Allowed values
- Reference Activity
 - Master Routing
 - Not Applicable
 
Note:- This field is displayed only if the Use Master Routing check box is selected in the Service Planning Parameters (tsspc0100m000) session.
 - By default, this field is set to Reference Activity. Master Routing
 
 - Master Routing
 - 
            
The master routing for which the pattern is generated.
 - Routing Option
 - 
            
The code of the routing option.
Note: This field is enabled only if the Activity Type field is set to Master Routing. - Year Number
 - 
            
The number of year(s) after which the reference activity is performed.
 - Months/ Weeks
 - 
            
The number of month(s) or week(s) after or in-which the reference activity is performed.
 - Month/Week
 - 
            
The option to specify when the reference activity must be performed.
Allowed values
- Month
 - Week
 - Not Applicable
 
 - Days
 - 
            
The number of day(s) after or on which the reference activity will be carried out.
 - Time Period
 - 
            
The number of month(s)/week(s) and day(s) after which the reference activity is performed.
 - Overrule Planned Start/Finish Tolerance
 - 
            
If this check box is selected, Infor LN does not consider the tolerance period.
 - Tolerance Period Start
 - 
            
The maximum time period with which the start date of the generated planned activity can be shifted.
 - Unit for Tolerance Period
 - 
            
The unit in which tolerance period is expressed.
 - Tolerance Period Finish
 - 
            
The maximum time period with which the finish date of the generated planned activity can be shifted.
 - Specific Child Item
 - 
            
If this check box is selected, you can specify the child item.
 - Child Item
 - 
            
The child item for which maintenance plan is generated.
 - Description
 - 
            
The description or name of the code.