Tolerance periods
If you use a tolerance period for an Installation group activity type, all activity types within this tolerance period can be automatically related to the Installation group activity type. To do this, you must use a specific function.
In the maintenance forecast, activity types can be linked to the activity type that is designated as the Installation group activity type. The saving in activities to be performed by means of clustering, can be manually implemented in the cost estimation of the Installation group activity type.
For this purpose, the cost estimates of the corresponding activity types are copied to the Installation group activity type.