Budgeted Extension Costs by Subcnt. Control Code (tpptc3538m000)
Use this session to list budgeted extensions by subcontractor control code for:
- The selected project code
 - The extension code
 - The cost analysis version
 
Field Information
- Project
 - 
            
The code that uniquely identifies the project.
 - Description
 - 
            
The description or name of the code.
 - Project Status
 - 
            
The project's status.
 - Budget Cost Analysis Version
 - 
            
The code that uniquely identifies the cost analysis.
 - Last Calculation Time
 - 
            
The date on which the latest budget-cost analysis was performed via the Generate Budget Cost Analysis (tpptc3200m000) session for the selected budget-cost analysis code.
 - Extension
 - 
            
The code that uniquely identifies the extension.
 - Description
 - 
            
The description or name of the code.
 - Currency
 - 
            
The default currency in the overview session is the project currency. Both in a dependent and in an independent currency system you can change this currency to other currencies with the Rotate Currency option <CTRL-R>.
The following sequence is applicable:
- Project currency
 - Local currency
 - Reporting currency 1
 - Reporting currency 2
 
Note: Only the last three currencies are home currencies. - Control Code Subcontracting
 - 
            
The code that uniquely identifies the control code.
 - Reference Type
 - 
            
The nature of the control code.
Allowed values
- Project
 - 
               
Specific to the selected project.
 - Standard
 - 
               
Common to all projects.
 
 - Quantity
 - 
            
The quantity of subcontracting budgeted under this control code.
 - Unit
 - 
            
The code that uniquely identifies the time unit.
 - Amount
 - 
            
The total cost of the extension in the budget for the control code.