Print Activity Budgets (tpptc2410m000)

Use this session to print the activity-budget line details for the selected activity (or activities) and project(s).

You can limit the printout by budget line number, cost-type and/or status.

Field Information

Budget Material Lines

If this check box is selected, the budget lines with a material cost-type are included in the print.

Activity Text

If this check box is selected, the print includes general text that relates to this check box.

Budget Labor Lines

If this check box is selected, the budget lines with a labor cost-type are included in the print.

Cost Object Text

If this check box is selected, the print includes general text that relates to this check box.

Budget Equipment Lines

If this check box is selected, budget lines with a equipment cost-type are included in the print.

Budget Line Text

If this check box is selected, the print includes general text that relates to this check box.

Budget Subcontracting Lines

If this check box is selected, the budget lines with a subcontracting cost-type are included in the print.

Budget Sundry Cost Lines

If this check box is selected, the budget lines with a sundry costs cost-type are included in the print.

Based on

The indicator for status-related selections.

Not Applicable

All activities and budget lines are included, regardless of their status.

Activities

Only activities with a selected status are included.

Budget Lines

Only budget lines with a selected status are included.

Not Applicable
Activities
Budget Lines
Currency

The home currency. In an independent currency system you can rotate between the company currencies. In a dependent situation you can also rotate but the home currency amount is always calculated with the reference currency and not directly with the rate amount.

Free

If this check box is selected, activities or budget lines with the Free status are printed.

Actual

If this check box is selected, activities or budget lines with the Actual status are printed.

Final

If this check box is selected, activities or budget lines with the status Final are printed.